Brighton railway station
Brighton railway station is the principal station serving the city of Brighton in Brighton and Hove, East Sussex, England, operated by Govia Thameslink Railway. It is the southern terminus of the Brighton Main Line, the western terminus of the East Coastway Line and the eastern terminus of the West Coastway Line. It is from via.
The station was built by the London & Brighton Railway in 1840–41, initially only connecting Brighton to Shoreham-by-Sea, westwards along the coast, in May 1840. In September 1841, it was connected inland to Haywards Heath and London Bridge via the new Clayton Tunnel; then in 1846 to the county town of Lewes to the east via the London Road Viaduct. The railway became the London, Brighton & South Coast Railway in 1846 following mergers with other railways with lines between Portsmouth and Hastings.
With 14.5 million passenger entries and exits in 2023-24, Brighton is the busiest station in East Sussex, the second busiest in South East England, and the seventh-busiest station in the country outside London.
History and development
The London & Brighton Railway built a passenger station, goods station, locomotive depot and railway works on a difficult site on the northern edge of Brighton. This site was from, and above the sea shore, and had involved considerable excavation work to create a reasonable gradient from Patcham Tunnel.Passenger station
The passenger station was a three-storey building in an Italianate style, designed by David Mocatta in 1839–40 which incorporated the head office of the railway company. The station is said to have many similarities to the Nine Elms railway station of the London and Southampton Railway designed by Sir William Tite. Baker & Son were paid £9766 15s for the station building between May and August 1841. The platform accommodation was built by John Urpeth Rastrick and consisted of four pitched roofs each long. It opened for trains to Shoreham on 12 May 1840, and to London on 21 September 1841.The station site was extended for the opening of the Brighton Lewes and Hastings Railway on 8 June 1846. In July 1846, the L&BR merged with other railways to form the London, Brighton & South Coast Railway.
Further extensions to the station occurred during the mid-19th century but only a limited number of additional platforms could be added because of the awkward sloping site. By the late 1870s the facilities were inadequate for the growing volume of traffic and so the existing platforms were lengthened to be able to accommodate two trains, and the three separate roofs were replaced by an overall roof during 1882/1883.
The station has an impressive large double-spanned curved glass and iron roof covering all of the platforms, which was substantially renovated in 1999 and 2000.
At the front of the station is a bus station. The station has six bus stops which are served by Brighton & Hove bus routes 1, 1A, N1, 5B, 6, 7, N7, 12, 12A, 12X, 13X, 14, 14C, 18, 24, 26, 27, 27B, 27C, 46, 48, 49, 55, 59 and 79. The station taxi rank is outside the rear of the station. A tunnel runs under the station which once provided an open-air cab run at a shallower gradient than Trafalgar Street outside, which had been the main approach to the station before the construction of Queen's Road. The cab run was covered when the station above was extended over it on cast iron columns. The cab run remains in situ but has been sealed at the station end, with the sloped entrance infilled with concrete and used as a storage area.
Help, a dog used to collect charitable donations, was displayed at the station following its death in 1891.
Goods station and yard
A goods station and yard was also constructed on the eastern side of the passenger station but on a site due to the sloping site, which was initially accessed from the Shoreham line by a second tunnel under the passenger station. The tunnel entrance was filled in after new tracks were laid into the goods yard, but a portion of it was converted into offices during World War II, and these were in use until the early 21st century. A portion of the tunnel is still used by a local rifle club, with an entrance staircase accessible from platforms 6 and 7. The site of the goods yard has since been redeveloped, and much of it forms the New England Quarter.Locomotive and carriage works
To the north of the station, on the east side of the main line, the railway constructed its locomotive and carriage works, which operated from 1841 until 1911, when the carriage works was moved to Lancing and 1957 when the locomotive works closed. Thereafter Isetta cars were briefly built in a part of the works.Locomotive depot
The London & Brighton Railway opened a small locomotive shed and servicing facility to the north west of the station for locomotives on the Shoreham line, in May 1840, and another, adjacent to the locomotive works for main line locomotives, the following year.During 1860–1861 John Chester Craven, the locomotive superintendent of the London Brighton and South Coast Railway began the removal of a large chalk hill to the north of the station, which had been dumped during the excavation of the main line. The space created was used to accommodate a new much enlarged motive power depot in 1861, replacing the two existing facilities. During the early 1930s, following the electrification of the lines the steam motive power depot was rebuilt and reduced in size. It was closed 15 June 1961 but remained in use for stabling steam locomotives until 1964 and was demolished in 1966.
The site is currently the Network Rail's ECR and infrastructure maintenance depot, and Southern's Lovers Walk Depot, used for servicing most of Southern's single voltage Class 377 and formerly Class 313 fleets.
Listed status
Brighton station was listed at Grade II* on 30 April 1973. As of February 2001, it was one of 70 Grade II*-listed buildings and structures, and 1,218 listed buildings of all grades, in the city of Brighton and Hove.Platform layout
The station has eight platforms, numbered 1 to 8 from left to right when looking from the main entrance. All platforms are long enough to accommodate 12-car trains, except platform 1 which can only hold up to 10 carriages.- Platforms 1 and 2 can only be used by services on the West Coastway line. They are served by Southern services towards,, West Worthing, Littlehampton,, and.
- Platform 3 is the only platform that can be used by services on all three lines, although trains on the West Coastway Line are limited to 4 carriages in length; services on the Brighton main and East Coastway lines are not restricted. The signalling also allows this platform to be occupied by two units on two separate lines at the same time, with a West Coastway train at the near end of the platform and a Brighton main or East Coastway train at the far end. During the day, the platform is usually used by Southern and Gatwick Express services to.
- Platforms 4-8 can be used by services on the Brighton Main Line and the East Coastway line. Usually, platform 4 shares with platform 3 the Southern and Gatwick Express services to London Victoria; platform 5 is served by Thameslink trains to, platform 6 by those to, while platforms 7 and 8 are used by Southern services on the East Coastway Line. However, this usage can be changed at times of disruption.
Services
Current services
Services at Brighton are operated by Southern, Gatwick Express and Thameslink using, and EMUs respectively.Services at the station are as follows.
Southern
The typical off-peak service in trains per hour is:- 2 tph to
- 2 tph to, of which 1 continues to
- 1 tph to Portsmouth & Southsea
- 1 tph to Chichester via Littlehampton
- 2 tph to
Gatwick Express
The typical off-peak service in trains per hour is:- 2 tph to
Thameslink
The typical off-peak service in trains per hour is:- 2 tph to via, and
- 2 tph to via Gatwick Airport, London Bridge and
Former operators and services
The following companies have served Brighton in the past:- London & Brighton Railway
- London, Brighton & South Coast Railway
- Southern Railway
- British Rail
- CrossCountry
- South West Trains
- Virgin CrossCountry
- Connex South Central
- Wessex Trains
- Thameslink
- First Capital Connect
- Great Western Railway
Until December 2007, South West Trains operated regular services to Reading and Paignton via Worthing and Chichester.
Until December 2008 CrossCountry and its predecessors operated services to and beyond.
Until May 2018, Brighton was served by an hourly service to Ashford International via Eastbourne. Now, all Ashford trains terminate at Eastbourne.
Until May 2022, Great Western Railway operated limited 3 car services to Bristol Temple Meads and beyond.
Disruptions to services from the station
Football matches at the Falmer Stadium are served by train services from Brighton to Falmer. A queuing system is in operation from 2 hours before kick off for trains departing from platforms 7 and 8. The stadium's 31,800 capacity means these queues are large close to kick off. After the game, fans leave the station via the emergency gates, and a queuing system is in operation for West Coastway Line services departing from platforms 1 and 2.The Lewes Bonfire night, usually on 5 November, attracts large numbers of people, many travelling through Brighton station. As a result, Southern operate a queuing system from the afternoon onwards.
The London to Brighton Bike Ride in June each year attracts large numbers of cyclists. As a result, Southern bans bicycles from many trains on the day, and on the following day it operates a queuing system at Brighton station. The train operators had in the past allowed bicycles on trains for the many cyclists returning to London.