Ballistic Missile Early Warning System


The RCA 474L Ballistic Missile Early Warning System was a United States Air Force Cold War early warning radar, computer, and communications system, for ballistic missile detection. The network of twelve radars, which was constructed beginning in 1958 and became operational in 1961, was built to detect a mass ballistic missile attack launched on northern approaches 15 to 25 minutes' warning time also provided Project Space Track satellite data.
It was replaced by the Solid State [Phased Array Radar System] in 2001.

Background

The Ballistic Missile Early Warning System was a radar system built by the United States during the Cold War to give early warning of a Soviet intercontinental ballistic missile nuclear strike, to allow time for US bombers to get off the ground and land-based US ICBMs to be launched, to reduce the chances that a preemptive strike could destroy US strategic nuclear forces.
The shortest route for a Soviet ICBM attack on North America is across the North Pole, so the BMEWS facilities were built in the Arctic at Clear Space Force Station in central Alaska, and Site J near Pituffik Space Base, North Star Bay, Greenland. When it became clear in the 1950s that the Soviet Union was developing ICBMs, the US was already building an early-warning radar system in the Arctic, the DEW line, but it was designed to detect bombers and did not have the capability of tracking ICBMs.
The challenges of designing a system that could detect and track a massive strike of hundreds of ICBMs were formidable. The radar sites were located as far north in the Arctic as possible, to give maximum warning time of an attack. However, the time between when a Soviet missile would rise above the horizon and be detected and when it would reach its target in the US was only 10 to 25 minutes.

Equipment

BMEWS consisted of two types of radars and various computer and reporting systems to support them. The first type of radar consisted of very large, fixed rectangular partial-parabolic reflectors with two primary feed points. They produced two fan-shaped microwave beams that allowed them to detect targets across a very wide horizontal front at two narrow vertical angles. These were used to provide wide-front coverage of missiles rising into their radar horizon, and by tracking them at two points as they climbed, enough information to determine their rough trajectory.
The second type of radar was used for fine tracking of selected targets, and consisted of a very large steerable parabolic reflector under a large radome. These radars provided high-resolution angular and ranging information that was fed to a computer for rapid calculation of the probable impact points of the missile warheads. The systems were upgraded several times over their lifetime, replacing the mechanically scanned systems with phased array radar that could perform both roles at the same time.
BMEWS equipment included:
  • General Electric AN/FPS-50 Radar Set, a UHF detector with transmitter having an organ-pipe scanner feed, fixed 1,500 ton parabolic-torus reflector, and receiver with Doppler filter bank to scan with two horizontally-sweeping fans for as many as ~12,000 observations per day for surveillance of space objects
  • RCA AN/FPS-49 Radar Set, a five-horn monopulse tracker and FPS-49A variant at Thule
  • RCA AN/FPS-92 Radar Set, an upgraded FPS-49 featuring more elaborate receiver circuits and hydrostatic bearings at Clear
  • Sylvania AN/FSQ-53 Radar Monitoring Set, with console and Signal Data Converter Group
  • Sylvania AN/FSQ-28 Missile Impact Predictor Set, with duplex IBM-7090 TX solid-state computers e.g., in Building 2 at Thule and part of the AN/FPA-21 Radar Central Computer at Site III—Satellite Information Processor software was later added at Site III for use on the backup IBM 7090.
  • RCA Communications Data Processor, as used in the Western Electric Air Force Communications Network of AUTODIN
  • Western Electric BMEWS Rearward Communications System, a network to link the separate elements and one of six ADC comm systems: BMEWS Rearward Long-Lines System at CFS Resolution Island and CFS Saglek,
  • BMEWS Central Computer and Display Facility at Ent AFB, with RCA Display Information Processor —DIPS displays were also at the Offutt AFB war room floor and balcony, as well as at the Pentagon
To predict when parts might break down, the contractor also installed RCA 501 computers with 32k high-speed memory, 5-76KC 556 bpi 3/4" tape drives, and 200-track random-access LFE drums. The initially replaced portions of BMEWS included the Ent CC&DF by the Burroughs 425L Missile Warning System at the Cheyenne Mountain Complex The original Missile Impact Predictors were replaced, and BMEWS systems were entirely replaced by 2001 after Satellite Early Warning Systems had been deployed.

Classification of radar systems

Under the Joint Electronics Type Designation System, all U.S. military radar and tracking systems are assigned a unique identifying alphanumeric designation. The letters “AN” are placed ahead of a three-letter code.
  • The first letter of the three-letter code denotes the type of platform hosting the electronic device, where A=Aircraft, F=Fixed, S=Ship-mounted, and T=Ground transportable.
  • The second letter indicates the type of equipment, where P=Radar, Q=Sonar, and R=Radio.
  • The third letter indicates the function or purpose of the device, where G=Fire control, R=Receiving, S=Search, and T=Transmitting.
Thus, the AN/FPS-49 represents the 49th design of an Army-Navy “Fixed, Radar, Search” electronic device.

Early tests

On 2 June 1955, a General Electric AN/FPS-17 "XW-1" radar at Site IX in Turkey that had been expedited was completed by the US in proximity to the ballistic missile launch test site at Kapustin Yar in the Soviet Union for tracking Soviet rockets and to demonstrate the feasibility of advanced Doppler processing, high-power system components, and computerized tracking needed for.
The first missile tracked was on 15 June, and the radar's parabolic reflector was replaced in 1958, and its range was extended from 1000 to 2000 nautical miles after the 1957 Gaither Commission identified that because of expected Soviet ICBM development, there would be little likelihood of SAC's bombers surviving since there was no way to detect an incoming attack until the first warhead landed.
BMEWS' General Operational Requirement 156 was issued on 7 November 1957 and on 4 February 1958; the USAF informed Air Defense Command that BMEWS was an "all-out program" and the "system has been directed by the President, has the same national priority as the ballistic missile and satellite programs and is being placed on the Department of Defense master urgency list". By July 1958 after NORAD manning began, ADC's 1954 blockhouse for the Ent AFB command center had inadequate floor space; and Ent's "requirement for a ballistic missile defense system display facility...brought renewed action...for a new command post".

Planning and development

On 14 January 1958, the US announced its decision to establish a Ballistic Missile Early Warning System with Thule to be operational in 1959—total Thule/Clear costs in a May 1958 estimate were ~$800 million The Lincoln Laboratory's radar at Millstone Hill, Massachusetts, was built and provided data to a 1958 for trajectory estimates, e.g., Cape Canaveral missiles, and an adjunct high-power UHF test facility employed the Millstone transmitter to stress-test the components that were candidates for the operational BMEWS. A prototype AN/FPS-43 BMEWS radar completed at Trinidad in 1958 went operational on 4 February 1959, the date of an Atlas II B firing from Cape Canaveral Launch Complex 11. On June 30, 1958, NORAD emphasized that the BMEWS could not be considered as a self-contained entity separate from the Nike Zeus, or vice versa.
On 18 March 1959, the USAF told the BMEWS Project Office to proceed with an interim facility for the "AICBM control center" with an anti-ICBM C3 computer, and the basement of the 1954 ADC blockhouse was considered for the interim center. A "satellite prediction computer" could be added to the planned missile warning center if Cheyenne Mountain's "hardened COC slipped considerably beyond January 1962" In early 1959 for use at Ent in September 1960, a BMEWS display facility with "austere and economical construction with minimum equipment" was planned in an "annex to the current COC building". In late 1959, ARPA opened the 474L System Program Office, and BMEWS' "12th Missile Warning Squadron at Thule...began operating in January 1960." Following a Nike ABM intercept of a test missile, the planned Cheyenne Mountain mission was expanded in August 1960 to "a hardened center from which CINCNORAD would supervise and direct operations against space attack as well as air attack" The 1st Aerospace Surveillance and Control Squadron was activated at Ent AFB on 14 February 1961; and Ent's Federal Building was completed.

Deployment

Clear AFS construction began in August 1958 with 700 workers and was completed 1 July 1961, and Thule Site J construction began by 18 May 1960, with radar pedestals complete by 2 June. Thule testing began on 16 May 1960, IOC was completed on 30 September, and the initial operational radar transmission was in October 1960.
On 5 October 1960, when Khrushchev was in New York, radar returns during moonrise at Thule
produced a false alarm. On 20 January 1961, CINCNORAD approved two-second FPS-50 frequency hoping to eliminate reception of echoes beyond artificial satellite orbits. On 24 November 1961, an AT&T operator failure at their Black Forest microwave station northeast of Colorado Springs caused a BMEWS communications outage to Ent and Offutt – a B-52 near Thule confirmed the site still remained.
Training for civilian technicians included a February 1961 RCA class in New Jersey for a Tracking Radar Automatic Monitoring class. The "Clear Msl Early Warning Stn, Nenana, AK" was assigned to Hanscom Field, Massachusetts, by the JCA on 1 April 1961. By 16 May 1961, Ent's "War Room at NORAD" had a glass map for plotting aircraft and had a "map lights up" to show multiple impact ellipses and times "before the huge missile would burst" The Trinidad Test Site transferred from Rome AFB to Patrick AFB on 1 July 1961 and the same month, the 1st Aero began using Ent's Space Detection and Tracking System operation center in building P4's annex The BRCS undersea cable was cut "presumably by fishing trawlers" in September, October, and November 1961 ; and in December 1961, Capt. Joseph P. Kaufman was charged "with giving defense data to... East German Communists."

BMEWS surveillance wing

The 71st Surveillance Wing, Ballistic Missile Early Warning System, was activated on 6 December 1961, at Ent AFB. Syracuse's BMEWS Test Facility at GE's High-Power Radar Laboratory became the responsibility of Rome Air Development Center on 11 April 1962 and on 31 July 1962, NORAD recommended a tracking radar station at Cape Clear to close the BMEWS gap with Thule for low-angle missiles By mid-1962, BMEWS "quick fixes" for ECCM had been installed at Fylingdales Moor, Thule and Cape Clear AK and by June 30, integration of BMEWS and SPADATS at Ent AFB was completed. During the Cuban Missile Crisis, the Moorestown AN/FPS-49 radar on 24 October was "withdrawn from SPADATS and realigned to provide missile surveillance over Cuba." 1962 "strikes and walkouts" delayed Fylingdales' planned completion from March until September 1963 and on 7 November, the Pentagon BMEWS display subsytem installation was complete. At the end of 1962, NORAD was "concerned over BMEWS' virtual inability to detect objects beyond a range of 1500 nautical miles." The Moorestown FPS-49 completed a BMEWS "signature analysis program" on scale models by January 1963.

Air Defense Command / Aerospace Defense Command

Operations transferred from civilian contractors to ADC on 5 January 1962 Fylingdales became operational on 17 September 1963, and Site III transferred to RAF Fighter Command on 15 January 1964.
Remaining BMEWS development responsibilities transferred to the "Space Track SPO " when the BMEWS SPO closed on 14 February 1964—e.g., the AN/FPS-92 with "66-inch panels" was added to Clear in 1966, and in 1967, BMEWS modification testing was complete on 15 May, when the system cost totaled $1.259 billion, equivalent to $ in.
In 1968, Ent's 9th Division HQ had a Spacetrack/BMEWS Maintenance Section.
In 1975, SECDEF told Congress that Clear would be closed when Cobra Dane and the Beale AFB PAVE PAWS became operational. By 1976, BMEWS included IBM 7094, CDC 6000, and Honeywell 800 computers.

USAF Space Command

On 1 October 1979, Thule and Clear transferred to Strategic Air Command when ADCOM was broken up then to Space Command in 1982. By 1981 Cheyenne Mountain had been averaging 6,700 messages per hour compiled via sensor inputs from BMEWS, the JSS, the 416N SLBM "Detection and Warning System, COBRA DANE, and PARCS as well as SEWS and PAVE PAWS" for transmission to the NCA. To replace AN/FSQ-28 predictors, a late 1970s plan for processing returns from MIRVs installed in new Missile Impact Predictor computers was complete by September 1984.

Replacement

The BMEWS was replaced by the Solid State Phased Array Radar System in 2001.