List of Apollo missions


The Apollo program was a United States human spaceflight program carried out from 1961 to 1972 by the National Aeronautics and Space Administration, which landed the first astronauts on the Moon. The program used the Saturn IB and Saturn V launch vehicles to lift the Command/Service Module and Lunar Module spacecraft into space, and the Little Joe II rocket to test a launch escape system which was expected to carry the astronauts to safety in the event of a Saturn failure. Uncrewed test flights beginning in 1966 demonstrated the safety of the launch vehicles and spacecraft to carry astronauts, and four crewed flights beginning in October 1968 demonstrated the ability of the spacecraft to carry out a lunar landing mission.
Apollo achieved the first crewed lunar landing on the Apollo 11 mission, when Neil Armstrong and Buzz Aldrin landed their LM Eagle in the Sea of Tranquility and walked on the lunar surface, while Michael Collins remained in lunar orbit in the CSM Columbia, and all three landed safely on Earth on July 24, 1969. Five subsequent missions landed astronauts on various lunar sites, ending in December 1972 with 12 men having walked on the Moon and of lunar rocks and soil samples returned to Earth, greatly contributing to the understanding of the Moon's composition and geological history.
Two Apollo missions were failures: a 1967 cabin fire killed the entire Apollo 1 crew during a ground test in preparation for what was to be the first crewed flight; and the third landing attempt on Apollo 13 was aborted by an oxygen tank explosion en route to the Moon, which disabled the CSM Odyssey's electrical power and life support systems, and made the propulsion system unsafe to use. The crew circled the Moon and were returned safely to Earth using the LM Aquarius as a "lifeboat" for these functions.

Uncrewed test flights

From 1961 through 1967, Saturn launch vehicles and Apollo spacecraft components were tested in uncrewed flights.

Saturn I

The Saturn I launch vehicle was originally planned to carry crewed Command Module flights into low Earth orbit, but its payload capacity limit could not lift even a partially fueled Service Module, which would have required building a lightweight retrorocket module for deorbit. These plans were eventually scrapped in favor of using the uprated Saturn IB to launch the Command Module with a half-fueled Service Module for crewed Earth orbit tests. This limited Saturn I flights to Saturn launch vehicle development, CSM boilerplate testing, and three Pegasus micrometeoroid satellite missions in support of Apollo.
MissionLaunchPadRemarksRefs
SA-1SA-1October 27, 1961, 15:06LC-34Test of Saturn I first stage S-I; dummy upper stages carried water
SA-2SA-2April 25, 1962, 14:00LC-34Dummy upper stages released of water into upper atmosphere, to investigate effects on radio transmission and changes in local weather conditions
SA-3SA-3November 16, 1962, 17:45LC-34Repeat of SA-2 mission
SA-4SA-4March 28, 1963, 20:11LC-34Test premature shutdown of a single S-I engine
SA-5SA-5January 29, 1964, 16:25LC-37BFirst flight of live second stage. First orbital flight.
AS-101SA-6May 28, 1964, 17:07LC-37BTested first boilerplate Apollo command and service module for structural integrity
AS-102SA-7September 18, 1964, 17:22LC-37BCarried first programmable-in-flight computer on the Saturn I vehicle; last launch vehicle development flight
AS-103SA-9February 16, 1965, 14:37LC-37BCarried Pegasus A satellite and boilerplate CSM
AS-104SA-8May 25, 1965, 07:35LC-37BCarried Pegasus B satellite and boilerplate CSM
AS-105SA-10July 30, 1965, 13:00LC-37BCarried Pegasus C satellite and boilerplate CSM

There was some incongruity in the numbering and naming of the first three uncrewed Apollo-Saturn or Apollo flights. This is due to AS-204 being renamed to Apollo 1 posthumously. This crewed flight was to have followed the first three uncrewed flights. After the fire which killed the AS-204 crew on the pad during a test and training exercise, uncrewed Apollo flights resumed to test the Saturn V launch vehicle and the Lunar Module; these were designated Apollo 4, 5 and 6. The first crewed Apollo mission was thus Apollo 7. Simple "Apollo" numbers were never assigned to the first three uncrewed flights, although renaming AS-201, AS-202, and AS-203 as Apollo 1-A, Apollo 2 and Apollo 3, had been briefly considered.

Saturn IB

The Saturn I was converted to the Uprated Saturn I, eventually designated Saturn IB, by replacing the S-IV second stage with the S-IVB, which would also be used as the third stage of the Saturn V with the addition of on-orbit restart capability. This increased the payload capacity to, enough to orbit a Command Module with a half-fueled Service Module, and more than enough to orbit a fully fueled Lunar Module.
Two suborbital tests of the Apollo Block I Command and Service Module, one S-IVB development test, and one Lunar Module test were conducted. Success of the LM test led to cancellation of a planned second uncrewed flight.
Mission Serial NoLaunchRemarksRefs
AS-201Saturn IB
SA-201
February 26, 1966,
16:12 GMT
Launch Complex 34
First test of Saturn IB and Block I Apollo CSM. Suborbital flight landed the CM in the Atlantic Ocean, demonstrating the heat shield. Propellant pressure loss caused premature SM engine shutdown.
AS-203Saturn IB
SA-203
July 5, 1966,
14:53 GMT
Launch Complex 37B
No Apollo spacecraft; instrumentation and video observed on-orbit behavior of S-IVB liquid hydrogen fuel in support of restart capability design for Saturn V. Deemed a success, despite inadvertent destruction of S-IVB during final overpressure tank rupture test.
AS-202Saturn IB
SA-202
August 25, 1966,
17:15 GMT
Launch Complex 34
Suborbital flight to Pacific Ocean splashdown. CM heat shield tested to higher speed; successful SM firings.
Apollo 5Saturn IB
SA-204
January 22, 1968,
22:48 GMT
Launch Complex 37B
First flight of LM successfully fired descent engine and ascent engines; demonstrated "fire-in-the-hole" landing abort test.

Launch escape system tests

From August 1963 to January 1966, a number of tests were conducted at the White Sands Missile Range for development of the launch escape system. These included simulated "pad aborts", which might occur while the Apollo-Saturn space vehicle was still on the launch pad, and flights on the Little Joe II rocket to simulate Mode I aborts which might occur while the vehicle was in the air.
MissionLaunch vehicleLaunchRemarksRefs
QTVLittle Joe IIAugust 28, 1963,
13:05 GMT Launch Complex 36
Little Joe II qualification test
Pad Abort Test 1-November 7, 1963,
16:00 GMT Launch Complex 36
Launch escape system abort test from launch pad
A-001Little Joe IIMay 13, 1964,
13:00 GMT Launch Complex 36
LES transonic test, success except for parachute failure
A-002Little Joe IIDecember 8, 1964,
15:00 GMT Launch Complex 36
LES maximum altitude, Max-Q abort test
A-003Little Joe IIMay 19, 1965,
13:01 GMT Launch Complex 36
LES canard maximum altitude abort test
Pad Abort Test 2-June 29, 1965,
13:00 GMT Launch Complex 36
LES pad abort test of near Block-I CM
A-004Little Joe IIJanuary 20, 1966,
15:17 GMT Launch Complex 36
LES test of maximum weight, tumbling Block-I CM

Saturn V

Prior to George Mueller's tenure as NASA's Associate Administrator for Manned Space Flight starting in 1963, it was assumed that 20 Saturn Vs, with at least 10 unpiloted test flights, would be required to achieve a crewed Moon landing, using the conservative one-stage-at-a-time testing philosophy used for the Saturn I. But Mueller introduced the "all-up" testing philosophy of using three live stages plus the Apollo spacecraft on every test flight. This achieved development of the Saturn V with far fewer uncrewed tests, enabling a Moon landing by the 1969 goal. The size of the Saturn V production lot was reduced from 20 to 15 units.
Three uncrewed test flights were planned to human-rate the super heavy-lift Saturn V which would take crewed Apollo flights to the Moon. Success of the first flight and qualified success of the second led to the decision to cancel the third uncrewed test.
Mission Serial NoLaunchRemarksRefs
Apollo 4Saturn V
SA-501
November 9, 1967,
12:00 GMT
Launch Complex 39A
First flight of Saturn V rocket; successfully demonstrated S-IVB third stage restart and tested CM heat shield at lunar re-entry speeds.
Apollo 6Saturn V
SA-502
April 4, 1968,
16:12 GMT
Launch Complex 39A
Second flight of Saturn V; severe "pogo" vibrations caused two second-stage engines to shut down prematurely, and third stage restart to fail. SM engine used to achieve high-speed re-entry, though less than Apollo 4. NASA identified vibration fixes and declared Saturn V man-rated.

Alphabetical mission types

The Apollo program required sequential testing of several major mission elements in the runup to a crewed lunar landing. An alphabetical list of major mission types was proposed by Owen Maynard in September 1967. Two "A-type" missions performed uncrewed tests of the CSM and the Saturn V, and one B-type mission performed an uncrewed test of the LM. The C-type mission, the first crewed flight of the CSM in Earth orbit, was performed by Apollo 7.
The list was revised upon George Low's proposal to commit a mission to lunar orbit ahead of schedule, an idea influenced by the status of the CSM as a proven craft and production delays of the LM. Apollo 8 was reclassified from its original assignment as a D-type mission, a test of the complete CSM/LM spacecraft in Earth orbit, to a "C-prime" mission which would fly humans to the Moon. Once complete, it eliminated the need for the E-type objective of a medium Earth orbital test. The D-type mission was instead performed by Apollo 9; the F-type mission, Apollo 10, flew the CSM/LM spacecraft to the Moon for final testing, without landing. The G-type mission, Apollo 11, performed the first lunar landing, the central goal of the program.
The initial A–G list was expanded to include later mission types: H-type missions—Apollo 12, 13 and 14—would perform precision landings, and J-type missions—Apollo 15, 16 and 17—would perform thorough scientific investigation. The I-type objective, which called for extended lunar orbital surveillance of the Moon, was incorporated into the J-type missions.
Mission typeMissionsDescription
AUncrewed flights of launch vehicles and the CSM, to demonstrate its design and to certify its safety for humans.
BApollo 5Uncrewed flight of the LM to demonstrate its design and to certify its safety for humans.
CApollo 7Crewed flight demonstration of CSM in low Earth orbit. Saturn 1B.
Apollo 8Crewed flight demonstration of CSM in lunar orbit.
DApollo 9Crewed flight demonstration of CSM and LM in low Earth orbit, operating the equipment together in space and performing the maneuvers involved in a lunar landing.
ECrewed flight demonstration of CSM and LM in medium Earth orbit, performing the maneuvers involved in a lunar landing.
FApollo 10Crewed flight demonstration of CSM and LM in lunar orbit, performing all G-type mission goals except for the final descent to and landing on the lunar surface.
GApollo 11Crewed lunar landing demonstration.
HPrecision crewed lunar landing demonstration and systematic lunar exploration.
IReserved for lunar survey missions.
JExtended scientific investigation of the Moon on the lunar surface and from lunar orbit.

Crewed missions

The Block I CSM spacecraft did not have capability to fly with the LM, and the three crew positions were designated Command Pilot, Senior Pilot, and Pilot, based on U.S. Air Force pilot ratings. The Block II spacecraft was designed to fly with the Lunar Module, so the corresponding crew positions were designated Commander, Command Module Pilot, and Lunar Module Pilot regardless of whether a Lunar Module was present or not on any mission.
Seven of the missions involved extravehicular activity, spacewalks or moonwalks outside of the spacecraft. These were of three types: testing the lunar EVA suit in Earth orbit, exploring the lunar surface, and retrieving film canisters from the Scientific Instrument Module stored in the Service Module.
MissionPatchLaunch dateCrewLaunch vehicleCM nameLM nameDurationRemarksRefs
Apollo 1February 21, 1967
Launch Complex 34
Gus Grissom
Ed White
Roger B. Chaffee
Saturn IB
Never launched. On January 27, 1967, a fire in the command module during a launch pad test killed the crew and destroyed the module. This flight was originally designated AS-204, and was renamed to Apollo 1 at the request of the crew's families.
Apollo 7October 11, 1968,
15:02 GMT
Launch Complex 34
Wally Schirra
Donn F. Eisele
Walter Cunningham
Saturn IB
10 d 20 h 09 m 03 sTest flight of Block II CSM in Earth orbit; included first live TV broadcast from American spacecraft.
Apollo 8December 21, 1968,
12:51 GMT
Launch Complex 39A
Frank Borman
James Lovell
William Anders
Saturn V
06 d 03 h 00 m 42 sFirst humans to leave Earth orbit and first to arrive at the Moon, first circumlunar flight of CSM, had ten lunar orbits in 20 hours. First crewed flight of Saturn V.
Apollo 9March 3, 1969,
16:00 GMT
Launch Complex 39A
James McDivitt
David Scott
Rusty Schweickart
Saturn V
GumdropSpider10 d 01 h 00 m 54 sFirst crewed flight test of Lunar Module; tested propulsion, rendezvous and docking in Earth orbit. EVA tested the Portable Life Support System.
Apollo 10May 18, 1969,
16:49 GMT
Launch Complex 39B
Thomas P. Stafford
John Young
Eugene Cernan
Saturn V
Charlie BrownSnoopy08 d 00 h 03 m 23 s"Dress rehearsal" for lunar landing. The LM descended to 8.4 nautical miles from lunar surface.
Apollo 11July 16, 1969,
13:32 GMT
Launch Complex 39A
Neil Armstrong
Michael Collins
Edwin "Buzz" Aldrin
Saturn V
ColumbiaEagle08 d 03 h 18 m 35 sFirst crewed landing in Sea of Tranquility including a single surface EVA.
Apollo 12November 14, 1969,
16:22 GMT
Launch Complex 39A
Charles (Pete) Conrad
Richard F. Gordon Jr.
Alan Bean
Saturn V
Yankee ClipperIntrepid10 d 04 h 36 m 24 sFirst precise Moon landing in Ocean of Storms near Surveyor 3 probe. Two surface EVAs and returned parts of Surveyor to Earth.
Apollo 13April 11, 1970,
19:13 GMT
Launch Complex 39A
James Lovell
Jack Swigert
Fred Haise
Saturn V
OdysseyAquarius05 d 22 h 54 m 41 sIntended Fra Mauro landing cancelled after SM oxygen tank exploded. LM used as "lifeboat" for safe crew return. First S-IVB stage impact on Moon for active seismic test.
Apollo 14January 31, 1971,
21:03 GMT
Launch Complex 39A
Alan Shepard
Stuart Roosa
Edgar Mitchell
Saturn V
Kitty HawkAntares09 d 00 h 01 m 58 sSuccessful Fra Mauro landing. Broadcast first color TV images from lunar surface Conducted first materials science experiments in space. Conducted two surface EVAs.
Apollo 15July 26, 1971,
13:34 GMT
Launch Complex 39A
David Scott
Alfred Worden
James Irwin
Saturn V
EndeavourFalcon12 d 07 h 11 m 53 sLanding at Hadley–Apennine. First extended LM, three-day lunar stay. First use of Lunar Roving Vehicle. Conducted three lunar surface EVAs and one deep space EVA on return to retrieve orbital camera film from SM.
Apollo 16April 16, 1972,
17:54 GMT
Launch Complex 39A
John Young
Ken Mattingly
Charles Duke
Saturn V
CasperOrion11 d 01 h 51 m 05 sLanding in Descartes Highlands. Conducted three lunar EVAs and one deep space EVA.
Apollo 17December 7, 1972,
05:33 GMT
Launch Complex 39A
Eugene Cernan
Ronald Evans
Harrison Schmitt
Saturn V
AmericaChallenger12d 13 h 51 m 59 sLanding at Taurus–Littrow. First professional geologist on the Moon. First night launch. Conducted three lunar EVAs and one deep space EVA.

Canceled missions

Several planned missions of the Apollo program were canceled for a variety of reasons, including changes in technical direction, the Apollo 1 fire, hardware delays, and budget limitations.
  • Before the Apollo 1 fire, two crewed Block I spacecraft missions were planned, but then it was decided that the second one would give no more information about the spacecraft performance not obtained from the first, and could not carry out extra activities such as EVA, and was canceled.
  • The Saturn V's all-up testing strategy and relatively good success rate accomplished the first Moon landing on the sixth flight, leaving ten available for Moon landings through Apollo 20, but waning public interest in the program led to decreased Congressional funding, forcing NASA to economize. First, was cut to make a Saturn V available to launch the Skylab space station whole instead of building it on-orbit using multiple Saturn IB launches. Eight months later, Apollo 18 and 19 were also cut to further economize, and because of fears of increased chance of failure with a large number of lunar flights.