Zangmu Dam
The Zangmu Dam is a gravity dam on the Yarlung Zangbo/Brahmaputra River northwest of Gyaca in the Tibet Autonomous Region of China. This dam is built a few kilometers from the Bhutan-India border. The purpose of the dam is hydroelectric power production using run-of-the-river technology. It is part of the Zangmu Hydropower Project and supports a 510 MW power station. Construction began in 2009 and the first generator was commissioned in November 2014.
The last became operational on 13 October 2015. It is the first dam on the Brahmaputra/Yarlung Zangbo River and has caused controversy in India.
Background
In 1972, the Chinese Academy of Sciences created the Qinghai-Tibet Plateau Comprehensive Scientific Expedition which in part studied conditions in the Tsangpo-Brahmaputra River basin. The study concluded that 114,000 MW of hydroelectric power generation capacity could be established in the basin, 79,000 MW from the main stem alone. A more in-depth hydrological study began in 1980 which identified 12 sites for dams. It was envisioned that the dams could alleviate power shortages in Lhasa. During the 1980s and 1990s, work failed to commence in the basin. Currently, there are 28 proposed dams in the basin, Zangmu being the only one approved for construction.In April 2009, China's Gezhouba Group was awarded a $167 million contract for the Zangmu Hydropower Project. According to the company, the contract is for the design and construction of the dam along with its power house to control water flowing downstream to North Eastern India. The project will require of concrete and 8 million tons of aggregate. Specifications for the dam are uncertain as China has not shared much information. On 12 November 2010, the construction reached coffer dam river closure. The reservoir was impounded and the first generator was commissioned on 23 November 2014. The power station was declared fully operational on 13 October 2015.