Yangji East station


Yangji East Station is a station on Line 10 of the Guangzhou Metro, and is also the current northern terminus of the line. It is located at the intersection of Guangzhou Avenue Middle and Jinsui Road in Tianhe District, Guangzhou. The station opened on 29 June 2025.

Station layout

The station has three floors. The ground floor is the exit, and is surrounded by Guangzhou Avenue Middle, Jinsui Road, the headquarters of Southern Daily Newspaper Group and nearby buildings. The first floor is the concourse, the second floor is the station equipment floor, and the third floor are the Line 10 platforms.
The entire station was constructed from north to south using underground excavation, cut-and-cover excavation and semi-covered excavation methods.

Concourse

There are electronic ticket vending machines and an AI customer service center at the concourse. To facilitate access, the west side of the station concourse is divided into a fare-paid area, where elevators, escalators, and stairs are installed to allow passengers to access the platform.

Platforms

The station has an island platform located underground on the east side of Guangzhou Avenue Middle. Toilets and a nursery room are located at the end of the platform towards.
In addition, there are three tracks at the north end of the platform for train storage. In addition to a set of double stabling tracks, one of the tracks extends several hundred meters to form a double-length stabling siding. Since this station served as the northern terminus when Line 10 opens, trains on Line 10 use this set of stabling tracks to turn-back beyond the station.

Entrances/exits

The station has 5 points of entry/exit, with Exits C2 and C3 being accessible via elevators.A: Guangzhou Avenue Middle, Guangdong Provincial People's ProcuratorateB: Guangzhou Avenue Middle, Guangzhou Tianhe Middle SchoolC1: Jinsui Road, Women and Children's Medical Center Affiliated to Guangzhou Medical University, Zhongshan Ophthalmic Center of Sun Yat-sen UniversityC2: Guangzhou Avenue Middle C3: Guangzhou Avenue Middle,

History

During planning and construction, this station was called Guangzhou Avenue Middle station. In April 2025, the Guangzhou Municipal Transportation Bureau announced the preliminary station names for Line 10. This station is planned to continue to use the name, Guangzhou Avenue Middle. Since Guangzhou Avenue Middle is about long and the existing Guangzhou Avenue Middle bus station is more than away from the metro station, this name has sparked discussions. Finally, in the following month, the authorities named this station Yangji East station, since it is located in the Yangji East Community of and to the east of the Yangji Community of Meihuacun Subdistrict.
The underground excavation of the station was completed on 22 April 2021. The main structure of the station finished construction on 20 December 2023, and the station completed the "three rights" transfer on 13 March 2025. On 29 June 2025, the station opened.

Future development

In the future, this station will become an interchange station with, which will be placed in parallel with Line 10. The concourse of Line 10 has reserved a transfer tunnel with Line 26.