Wuhan Metro


Wuhan Metro is a rapid transit system serving the city of Wuhan, Hubei, China. Owned and operated by Wuhan Metro Group Co., Ltd., the network now includes 12 lines, 312 stations, and 518 kilometres of track length. With 1.35 billion annual passengers in 2023, Wuhan Metro is the sixth-busiest rapid transit system in mainland China. There are a number of lines or sections under construction.
Line 1, the first line in the system, opened on 28 July 2004, making Wuhan the seventh city in mainland China with a rapid transit system, after the cities of Beijing, Tianjin, Shanghai, Guangzhou, Changchun, and Dalian. Line 2 opened on 28 December 2012 and is the first underground rail line crossing the Yangtze River. The system has since undergone rapid expansion.

History

Preliminary studies of urban rail transit systems were prompted by the city shortly after a Belgian Railways delegation visit in 1984. Following the demolition of the old Beijing-Hankou Railway, the city of Wuhan planned to utilize the corridor to construct the city's first rapid transit rail line. In September 1992, the Wuhan Metro Construction Group was established by Wuhan Municipal Construction Commission and a supervision group, led by the mayor Qian Yunlu, was subsequently formed in 1993 to facilitate the project's funding, planning, logistics, and organization. It took seven years before the city was able to fund construction.
In October 1999, the National Planning Commission approved the Wuhan "Light Rail" project, signalling the start of serious work on the rail transit project. On October 2, 2000, the Wuhan Municipal Government ratified the establishment of Wuhan Rail Transit Co., Ltd., and contracted construction, operation, administration and related real estate development to the corporation.
In December 2000, the National Planning Commission accepted a feasibility report on the project and approved construction on phase 1 of Line 1. On December 23, 2000, the project broke ground and comprehensive construction began.
In 2002, with the anticipation of an economic boom and increasing demand for urban rail transit, Wuhan Municipal Government approved the city's first long-term rail transit master plan. On July 28, 2004, the ten-station long "light rail" line was opened to the public and entered revenue service in August. However, low ridership discouraged the city from funding the extension project, for which ground had been broken on December 15, 2005, and a 4-year delay in construction ensued. In April 2006, the NDRC ratified a six-year construction/operation plan, but it was not until a year later on April 9, 2007, that NDRC accepted the feasibility report for line 1, phase 2 and approved construction on the project.
In the interim, construction began on Fanhu station of the fully underground Line 2 on November 16, 2006, as a response to the six-year plan adopted by NDRC earlier. Construction also began on the underground line 4 stations of Wuchang railway station in June, and Wuhan railway station in September, as parts of the integral capital project to revamp and construct the Wuhan Railway Hub.
In May 2007, the Hubei Provincial Development and Reform Commission approved preliminary designs on Line 1, phase 2, and comprehensive construction subsequently commenced in June. On May 15, the city government approved the establishment of Wuhan Metro Group Co., Ltd., which would replace the Wuhan Rail Transit Co., Ltd and assume its responsibilities and benefits.
On September 12, 2007, the NDRC accepted the feasibility report to Line 2, phase 1, and preliminary designs were approved by the HDRC in December 2007. However, it was not until September 2008 that land purchases and funding were facilitated and comprehensive construction began to take place. In October 2009, drilling of the Yangtze River tunnel started.
On March 13, 2009, the NDRC accepted a feasibility report to Line 4, phase 1. On May 13, 2009, the HDRC ratified preliminary designs on Line 4, phase 1. Comprehensive construction ensued on the Wuchang segment of Line 4. A more ambitious urban rapid transit plan was submitted for NDRC review in October 2009, and in late November, on-site panel investigations were conducted by China International Engineering Consulting Corporation.
In February 2010, Wuhan Metro's first commercial property was topped out in Hanxi 1st Road station. On July 29, Line 1 phase 2 entered revenue service from Dijiao to Dongwu Boulevard. Despite plans to extend the westernmost terminus to Jinshan Avenue in Dongxihu District, the station was never built. A short stub with crossover tracks was constructed behind Dongwu Boulevard. Zhuyehai, a station in Qiaokou District, remained non-operational in spite of the existence of complete platforms. Neither exits nor staircases had been built yet. It was due to open when the Wuhan IKEA store was completed in late 2014.
A revised and more detailed construction plan was accepted by the NDRC on January 31, 2011. The plan specified the city's plan to complete construction on Line 3, 4, 6, 7, and 8 before 2017. Beginning on March 1, Line 1 subdivided its fare zones from 3 to 5 and lowered maximum fare per ride from 5 CNY to 4 CNY. Wuhan Tong cardholders will receive a 20 percent discount on single ride fares. On April 9, Line 1 welcomed its 100,000,000th customer, who was awarded a one-year pass to the Metro. On September 9, preliminary designs on Line 4, phase 2 was approved by HDRC.
On February 17, 2012, the NDRC accepted a feasibility report on Line 3, phase 1, the fourth line in Wuhan Metro's grid and the first to cross the Han River, connecting the boroughs of Hankou and Hanyang. A feasibility report to Line 6—the second Hankou-Hanyang connection—was also approved by the NDRC on December 21, 2012. Seven days later, Line 2 entered revenue service, connecting some of the most populated areas of Hankou, Wuchang, and the Optics Valley.
On April 12, 2013, the NDRC granted acceptance to a feasibility report of Line 8, phase 1, which connects Hankou and Wuchang via the Second Yangtze River Bridge corridor. Construction began in June 2013 and was completed in December 2017.
On 23 January 2020, the entire metro network was shut down, along with all other public transport in the city, including national railway and air travel, in an effort to control the spread of the COVID-19 pandemic in Hubei.
On 28 March 2020, six lines resumed operations, after a two-month lockdown. On 8 April 2020, Line 8 Phase 1 resumed operations. On 22 April 2020, Line 8 Phase 3, Line 11, Yangluo line resumed operations.

Timeline of network expansion

Lines

Line 1

Line 1 is a elevated urban rail line entirely located in the borough of Hankou. It runs a northwest–southeast route that approximately parallels with Jiefang Avenue for its entire length. There are 27 planned stations, among which 25 are operational. Line 1 operates 33 four-car train sets, 12 of which are manufactured by Changchun Railway Vehicles, and 21 by Zhuzhou Electric Locomotive Co., Ltd.
On July 28, 2004, the first phase of Line 1 began service from Huangpu Road to Zongguan. On July 28, 2010, Line 1 extended from both ends after the completion of phase 2. The phase 3 expansion, which extends the northeast terminus to Hankou North Station, entered revenue service on May 28, 2014. The phase 4 expansion, which extends to Jinghe Station from Dongwu Boulevard. The phase 4 opened on December 26, 2017. Line 1's color is blue.

Line 2

Line 2 is a underground subway connecting the boroughs of Hankou and Wuchang. Upon completion, Line 2 was the first subway in China to cross the mighty Yangtze River. It runs in a northwest–southeast route and crosses the Yangtze River near Jianghan Road, and Jiyuqiao in Wuchang. Tunnel drilling concluded on February 26, 2012. Revenue service of Line 2 began on December 28, 2012. Line 2 operates 41 six-car train sets, all of which were manufactured by Zhuzhou Electric Locomotive Co., Ltd.
Line 2 is mostly underground, except for Songjiagang and Hangkongzhongbu stations. It was extended towards both directions. The southern extension brought the southeast terminus from Optics Valley Square to Fozuling, and the northwest extension plan brought the northwest terminus from Jinyintan to Tianhe International Airport, providing convenient access for airport and residential areas en route. Early on, construction work on both extensions was expected to commence in 2013, and the tentative completion dates was set at 2015. In May 2014, it was reported that the construction work on the southern extension would start within 2014, with construction completed by February 19, 2019.
Nowadays, Line 2 only have 6 cars, but in the future, it is possible to add 2 more cars to carry more people during rush hours when 6 cars are not enough. Line 2's color is pink.

Line 3

Overall construction of Line 3 was approved by National Development and Reform Commission on February 23, 2012, and officially started on March 31, 2012. Line 3 went into operation on December 28, 2015. Line 3 cars are Type B and manufactured by CRRC Changchun Railway Vehicles. Line 3's color is dark yellow.

Line 4

Line 4 is mostly underground. It will run in an east–west route serving the Hanyang and Wuchang distincts. The first phase linking Wuchang and Wuhan railway stations opened on December 28, 2013; since that day, all three main railway stations of Wuhan are connected by the Metro. The second phase of Line 4 will crossing the Yangtze River to Hanyang opened in 2014. Line 4 cars are Type B and manufactured by CRRC Zhuzhou Electric Locomotive. Line 4's color is light green.

Line 5

Line 5 started operation on 26 December 2021. Line 5's color is coral.