World Trade Center Chennai


The World Trade Center, Chennai is a 28-storeyed commercial and residential centre in Chennai, India. Located at Perungudi, it was made operational in March 2020. The centre consists of of office space. The complex also includes a conference/exhibition centre. The towers are IGBC LEED Platinum and USGBC LEED Gold certified. The centre is a member of the World Trade Centers Association. Tower A of the WTC complex is the tallest commercial establishment in the city. The development is part of the larger expansion of the Old Mahabalipuram Road corridor as a major IT and commercial hub in Chennai.

History

In 2016, India's Brigade Group and Singapore's GIC, a sovereign wealth fund, jointly acquired a land parcel at Perungudi, purchased from Kansai Nerolac Paints for. The land acquisition was facilitated by Perungudi Real Estates, a special purpose vehicle formed by Brigade Enterprises and GIC, with the help of real estate firm Jones Lang LaSalle. Construction of a world trade centre and residential units, entailing an investment of more than was planned on the land. The foundation stone was laid on 9 June 2017. Initially expected to be operational by March 2020, the centre became functional officially in September 2021. The project’s phased construction was aligned with Chennai’s growing commercial real estate requirements, with the WTC designed to serve both multinational tenants and emerging Indian technology firms.

Features

The complex consists of five towers, including two office towers, a hotel tower and two residential towers. Built on a plot and developed as a Grade A++ commercial development, all the towers have three basements. The first office tower has 28 floors above the street, the second office tower 20 floors, the third tower 8 floors, and the fourth and the fifth towers 5 floors each. The total floor space of the construction would be. The 28-storied Tower A has a total floor space of, with a typical floor area of. Tower B has a typical floor area of. The complex has three levels of combined basement and includes development of more than of premium office space spread across two towers. The campus includes landscaped open areas, multi-level parking, and centralized amenities, consistent with WTCA’s standards for mixed-use business districts. Upon completion, Tower A will be the tallest commercial structure in Chennai. It consists of premium retail and hotel within the campus. The complex has a frontage of on the Old Mahabalipuram Road. Once fully operational, the WTC can house 20,000 to 25,000 employees. 298-unit high-end residential apartments will also be constructed. The apartment block consists of 27-storeyed twin towers to be built on of land. Besides, there will be another tower with 80 Marriott Exclusive apartments. These towers are to be completed by October 2024. A public park has also been constructed along with a basketball court.
The development will be led by the WTCA. The WTC has become an important landmark of Chennai city.
The total development potential of the complex is.

Operations

The WTC officially become functional in September 2021 with its first occupant, Kissflow Inc., a software-as-a-service company, moving its 350 employees into its WTC office. In March 2022, Amazon opened its office at the WTC, occupying 18 floors across to accommodate 6,000 employees. In November 2023, Hapag-Lloyd Technology Center began its operations at the WTC.
As of June 2024, the WTC is over 90% leased and houses marquee tenants.