Workers' Stadium station


Workers' Stadium station is an interchange station between Lines [Line Line 3 (Beijing Subway)|3 (Beijing Subway)|3] and [Line Line 17 (Beijing Subway)|17 (Beijing Subway)|17] of Beijing Subway. The Line 17 platform opened on December 30, 2023 alongside the opening of Line 17's northern section, and the Line 3 platform opened on December 15, 2024. The Line 17 platform served as the southern terminus of the northern section of the line until the middle section of Line 17 opened on December 27, 2025, connecting it with the southern section at.

History

The construction of the station started in November 2018. The station is an interchange station between Line 3 and Line 17. The Line 3 portion and the Line 17 portion were constructed at the same time.
The structure of the station was completed in March 2023, and Line 17 service between this station and Future Science City North commenced on December 30, 2023. Line 3 began serving this station on December 15, 2024.
The Line 17 section between this station and Shilihe opened on December 27, 2025.

Station layout

Both the Line 3 and Line 17 stations have underground island platforms. The two lines share a concourse.
The concourse level for Line 3 features artwork that show pandas playing football, a nod to the nearby Workers' Stadium from which the station derived its name and is the home ground of football club Beijing Guoan. The Line 17 concourse similarly features an art display titled "Dashing and Full of Vitality " that shows characters playing football.

Exits

There are 7 exits, lettered A, B, C, D, F, G and H. Exits C, D and F opened with Line 17, whilst exits A, B, G and H opened with Line 3.
Exit C leads to Xindong Road, D to Gongrentiyuchang North Road and F to Workers' Stadium at Gongrentiyuchang East Road. Exit F has an accessible elevator.