Wong Chuk Hang Road


Wong Chuk Hang Road is a major thoroughfare in Hong Kong Island. It is part of Hong Kong's Route 1. It is a 6-lane major thoroughfare.
Wong Chuk Hang Road connects Aberdeen Praya Road and Aberdeen Tunnel.

Flyover

A flyover long with 4 lanes passes over Wong Chuk Hang Road. The construction for the flyover cost 358 million Hong Kong dollars. Construction began in October 1998, and ended in December 2001.

Interchanges

The section of Route 1 that runs through Wong Chuk Hang Road has 4 exits. They are numbered 1A, 2, 3, and 4. The entire road is in Wong Chuk Hang, Southern District.