Westwood Power Station
Westwood Power Station was a coal-fired power station situated adjacent to the Leeds and Liverpool Canal in Ince-in-Makerfield in Greater Manchester, North West England.
History
The station was constructed in 1948–50 by the British Electricity Authority. It used two tall cooling towers to cool its water.The boiler plant comprised five Babcock & Wilcox pulverised fuel fired boilers capable of delivering 1,425,000 lb/h of steam at 660 psi and 393 °C.
Following the construction of the national grid in 1928-33 Westwood power station was connected to an electricity grid ring which included the power stations at Southport, Lister Drive, Warrington and Ribble ; this was one of three electricity rings in the North West.
The generating capacity of the station was 128 MW comprising four uprated British Thomson-Houston 32 MW turbo-alternators. The first generating set was commissioned in September 1951 followed by the other sets in December 1951, September 1952, and December 1953.
Steam condensing and cooling was by two Mitchell reinforced concrete hyperbolic cooling towers, each tower had a capacity of 3 million gallons per hour.
The generating capacity and output from Westwood power station is given in the following graph and table.
Westwood power station electricity output, GWh
| Year | 1954 | 1955 | 1956 | 1957 | 1958 | 1961 | 1962 | 1963 | 1972 | 1979 | 1982 |
| Installed capacity, MW | 112 | 112 | 112 | 112 | 112 | 128 | 128 | 128 | 128 | 128 | 128 |
| Electricity output, GWh | 58.08 | 631.32 | 605.82 | 457.36 | 544.62 | 543.495 | 583.181 | 609.853 | 217.35 | 280.33 | 185.97 |
In the year ending 31 March 1972 the station's load factor was 20.6 per cent.
The station was demolished in 1989, the cooling towers were demolished on 15 January 1989.