Wenzhou rail transit
Wenzhou Rail Transit, operated by Wenzhou Mass Transit Rail Corporation, is the rapid transit network serving the city of Wenzhou, Zhejiang Province, China.
Three lines have received approval from the NDRC, and two more lines are not approved by NDRC. Line S1 has been under construction since November 2011 and was opened in January 2019. Line S2 opened in August 2023. Line S3 is under construction and will open in 2027. The first three lines are projected to cost about 50 billion yuan.
Nomenclature
In the PRC in general both the terms 市郊铁路 and 市域铁路 refers to newly-opened commuter/regional railway services in general interchangeably, and are designated with Latin letter S. In Southern Zhejiang province, however, 市郊铁路 refers to genuine commuter/regional lines like that of Transilien, while 市域铁路, dubbed with S, refers to the partially underground urban system like that of the RER.Taizhou, in particular, has both systems in its rail transit in operation; while Wenzhou has both a RER-like system in operation and a planned rapid transit. The RER-like system has everything similar to a rapid transit in terms of operation, and has no direct connections with the national railway system, yet still has a loading gauge and signaling system inherited from the interprovincial railway and runs on the left track, and comes with a longer distance between stations. Due to the state restrictions on rapid-transit building in smaller cities some city governments use this methods to circumvent such restrictions, branded as a rapid transit toward the citizens while as a commuter rail toward the central government.
In operation
Line S1
The first phase of Line S1 begins at Tongling station in the west, south of Wenzhou South Railway Station, and ends at Shuang'ou Avenue station in the east, with of track and 18 stations. Construction of the Shitan Tunnel of Line S1 began on 11 November 2011, and the rest of the line officially began construction in March 2013. Line S1 was originally scheduled to open in October 2018. The west section of the line was opened on January 23, 2019. The last section of the line was opened on September 28, 2019.Line S2
The first phase of Line S2 runs from Qingdong Road Station in Yueqing to Dongshan Station in Rui'an, with of track and 20 stations, including one at Wenzhou Longwan International Airport. Construction of S2 began in January 2016. Line S2 will feature distinct express and local services. Line S2 opened on August 26, 2023.Approved lines
As of 2023, one line is under construction: Line S3.The first phase of Wenzhou Rail Transit received official approval from the National Development and Reform Commission in September 2012. This phase includes three lines: S1, S2, and S3, with a total length of. Construction is projected to complete by 2018, at an estimated cost of about 50 billion yuan.
Line S3
The first phase of Line S3 starts at, along Wenrui Avenue, passes through Nanbaixiang, Xianyan, Tangxia to Rui'an City, then crosses Feiyun River to the south, passes Kunyang, Aojiang, Longgang, to Lingxi. It is expected to open in 2027.The first phase of the Wenzhou Rail Transit S3 Line has a total length spans 31.05 kilometers, comprising an underground stretch of 2.821 kilometers and an elevated segment of 24.17 kilometers. This phase includes 13 stations, with 10 elevated stations and 3 underground stations incorporated along the route.
The second phase of this line, costing 26.40 billion yuan, extends over a length of 66 kilometers and encompasses 17 stations. Approximately 32.4% of this phase consists of underground lines, traversing through the districts of Rui'an City, Pingyang County, Cangnan County, and Longgang City.