Veluwemeer Aqueduct
Veluwemeer Aqueduct is a long, 19 meter wide, navigable aqueduct located over Veluwemeer lake in Harderwijk, Netherlands. It was opened in 2002 and bypasses the N302 road.
The construction of the aqueduct took some 22,000 cubic metres of concrete, plus steel sheet piling to bear the heavy weight of the water over the road and to prevent water and sediment from leaking onto the road below.