The plan for the flyovers was first proposed in 2010. The first-level flyover connects the Velachery Bypass Road with the Velachery–Tambaram Road near the Velachery MRTS station. This flyover has 15 spans and lands around 190 meters ahead of the MRTS bridge. The second-level flyover connects the TaramaniLink Road and the Velachery Bypass Road. It is 1,200 meters long and has 32 spans. The centralspan of this flyover is the longest of all, at 40 meters length, right above the Vijayanagar junction. The height of the second flyover is 15 meters.