Upper Trishuli 3A Hydropower Station
Upper Trishuli 3A Hydropower Station is a run-of-river hydro-electric plant located in Rasuwa District of Nepal. The flow from Trisuli River is used to generate 60 MW electricity.
The plant is owned and developed by Nepal Electricity Authority. The plant started generating electricity from 2076-05-13 BS. The generation licence will expire in 2102-11-14 BS. The power station is connected to the national grid.