Upper Naugad Hydropower Station


Upper Naugad Hydropower Station is a run-of-river hydro-electric plant located in Darchula District of Nepal. The flow from Naugad River is used to generate 8 MW electricity. The design flow is and gross head is 163.44.
The plant is owned and developed by Api Power Company Ltd., an IPP of Nepal. The plant started generating electricity from 2076-07-13BS. The generation licence will expire in 2108-09-14 BS, after which the plant will be handed over to the government. The power station is connected to the national grid at Balanch of Shailya Shikhar Municipality and the electricity is sold to Nepal Electricity Authority.