USS Speedwell
USS Speedwell was a Fortune-class tugboat of the United States Navy. Ordered to support the Anaconda Plan during the American Civil War, she was commissioned to late to see action and instead operated as a yard craft in various US Navy shipyards before she was decommissioned in 1890.
Development and design
During the American Civil War, the Union Navy aimed to blockade the Confederate States into submission. To maneuver blockading warships, it needed a fleet of tugboats. By 1864, the existing fleet of small, wooden-hull, weak riverine boats were unsatisfactory. To address the issue, a series of iron-hull, propeller-driven tugboats were ordered. The largest design became known as the Fortune or Pinta-class tugboat.She had an overall length of, beam of, depth of, displacement of 420 tons, and a crew of 52. One vertical compound steam engine turned a propeller that could produce a top speed of, and the tugboat was armed with two guns.