Troll gas field
Troll is a natural gas and oil field in the Norwegian sector of the North Sea, one of the biggest in the North Sea, holding 40% of Norway’s gas – it also possesses significant quantities of oil, in thin zones under the gas cap, to the west of the field. The field as a whole consists of the main Troll East and Troll West structures in blocks 31/2, 31/3, 31/5 and 31/6, about west of Kollsnes, near Bergen. Most of the gas lies in Troll East.
Operators
The field is operated by Equinor, which has a 30.58% interest. The other partners are Petoro, Shell plc, ConocoPhillips and TotalEnergies.Platforms
Gas and oil from the field are extracted via three platforms – Troll A, B and C.The Troll A platform, based on the Condeep technology, is the tallest structure ever to be moved. Total weight is 656,000 tons and the total height. The legs extend below sea level. This platform came into production in 1996 after being towed out from Rogaland in May 1995.
The Troll B Platform is a semi-submersible designed by Doris and fabricated from concrete; thought to be the only concrete semisubmersible. This platform came into production in 1995.
The Troll C Platform is a conventional steel hull semi-submersible designed by GVA Consultants. This platform came into production in 1999.