Highway 6 (Israel)
Highway 6, also known as the Trans-Israel Highway or Cross-Israel Highway , is a major electronic toll highway in Israel. Highway 6 is the first Israeli Build-Operate-Transfer road constructed, carried out mainly by the private sector in return for a concession to collect tolls on the highway for a given number of years. It is also one of the largest infrastructure projects undertaken in Israel.
History
The highway is officially dedicated the Yitzhak Rabin Highway, though this name is not commonly used. It began operating in 2002 and continues to be lengthened as construction proceeds on newer sections. The southern terminus is at Shoket Interchange, opened in November 2016. The northern terminus is the Tel Kashish Interchange, opened on November 14, 2018, where the highway now merges into Highway 70 heading northwest. Another northern extension to Somech Interchange opened in 2019.In July 2025, Transportation Minister Miri Regev announced a NIS 5 billion plan to construct 48 kilometers of elevated highway above the existing road's most congested sections. A 16-kilometer section would run between the Nahshonim Interchange and the Eyal Interchange, while in the south, 32 kilometers of new highway would rise above the existing road between the Baqa-Jatt Interchange and the Horshim Interchange.
Goals
The highway aims to provide an efficient north–south transportation corridor in Israel while allowing drivers to bypass the traffic-congested Tel Aviv region in the country's center. Thus, it is the easternmost major highway in Israel, in some places located almost right on the Green Line. Currently, it is long, all of which is a controlled-access highway. This figure will grow in the next few years as additional segments are extended northward and southward from the existing section of the road., some parts were under construction while others were undergoing statutory approvals and permitting processes.Characteristics and pricing
Highway 6 uses a system of cameras and transponders to toll vehicles automatically. The lack of toll booths allows it to operate as a normal freeway with interchanges. A radio antenna detects when a vehicle with a transponder has entered and exited the highway, calculating the toll rate. An automatic license plate recognition system is used for vehicles without a transponder. Monthly statements are mailed to users. Highway 6 is based on the technology of Highway 407 in Ontario, Canada developed by Raytheon.The pricing scheme is based on the number of segments a driver passes in a trip. Each segment is the road span between two interchanges., the pricing for up to 3 segments was 19.78 NIS, 23.83 NIS for four segments, and 27.88 NIS for five or more segments. An additional fee is paid when driving through the "northern" segment, the cost of which is an additional 5.74 NIS. Pricing for motorcycles and heavy vehicles such as trucks is different.
The price above is discounted for drivers who register with Highway 6's operator and install the in-vehicle transponder unit to record their highway usage. When a vehicle does not have a transponder, its license plate is scanned, and the vehicle is identified. Drivers who pre-register their license plate with the operator and establish a direct billing relationship also receive a discounted rate. The bill is sent to the vehicle's owner if the license plate is not in Highway 6's database, according to the car registration with the Israeli Ministry of Transportation. Such a vehicle pays the highest rate.
The licensed road operator, Derech Eretz, operates a fleet of service vehicles that patrol the entire highway and assist drivers in need. Since it is technically a private road, the road operator must pay the Israel police for traffic enforcement.
The tolled sections north of Yokneam are operated by a separate franchisee called "6 – Northern Crossing." Registration and billing for these sections are handled separately by them, and tolling is performed using automatic license plate recognition only.
Free segments
All the existing segments of Highway 6 south of the Soreq interchange are free of charge in both directions, as is the segment between Ben Shemen and Daniyyel interchanges, where Highway 6 runs concurrently with Highway 1. The northern section between Highway 77 and Highway 75 in the western Jezreel Valley is also free.Financial statistics
In March 2006, Derech Eretz reported a profit of 89 million NIS for 2005, an increase of 56% from 2004, on income of 779 million NIS, an increase of 137% from 2004.At the end of 2005:
- about 500,000 registered subscribers,
- 1.36 million individual users,
- 21 million trips,
- 80% of trips are by subscribers,
- Bill collection success rate was 97%.