Touvedo Dam is a concrete gravity dam on the Limia. It is located in the municipalities of Ponte da Barca and Arcos de Valdevez, in Viana do Castelo District, Portugal.
Construction of the dam began in 1987. The dam was completed in 1993. It is owned by Companhia Portuguesa de Produção de Electricidade. The dam is used for power generation, irrigation and flood control.

Dam

Touvedo Dam is a 42.5 m tall and 133.5 m long gravity dam with a crest altitude of 55 m. The volume of the dam is 74,620 m³. The spillway with 3 cradial gates is part of the dam body. There is also a bottom outlet which can discharge up to 50 m³/s.

Reservoir

At full reservoir level of 50 m the reservoir of the dam has a surface area of 1.72 km² and a total capacity of 15.5 mio. m³. The active capacity is 4.5 mio. m³. Minimum operating level is 47.5 m.
The reservoir of Touvedo Dam serves as lower reservoir for the Alto Lindoso pumped-storage power plant.

Power plant

The hydroelectric power plant was commissioned in 1993. It is operated by EDP. The plant has a nameplate capacity of 22 MW. Its average annual generation is 66.8 GWh.
The power station contains one Kaplan turbine-generator with 22.2 MW in a dam powerhouse located on the left side of the dam. The turbine rotation is 187.5 rpm. The minimum hydraulic head is 20 m, the maximum 25 m. Maximum flow per turbine is 100 m³/s.
The turbine and generator were provided by GEC-Alstom.