Thulamela Local Municipality


Thulamela Municipality is a local municipality within the Vhembe District Municipality, in the Limpopo province of South Africa. Its municipal boundaries were greatly altered after the 2016 [South African municipal elections|2016 municipal elections] when much of the area that formerly belonged to the municipality, including the town of Malamulele, was incorporated into the newly formed Collins [Chabane Local Municipality]. It is named after the Thulamela ruins located near the Pafuri Gate of the Kruger National Park.

Main places

The South African [National Census of 2011|2011 census] divided the municipality into the following main places:
PlaceCodePopulationArea
Begwa2,0663.32
Budeli2,3629.24
Buluni3821.08
Damani1,3363.83
Dididi2,3122.94
Dimani8071.92
Dlamini1460.50
Dopeni6,56015.15
Doveni3181.28
Dumasi2,1542.60
Duthuni6,3456.70
Dzindi2,7872.03
Dzingahe2,8622.14
Dzivhadolo1,5662.73
Dzwaboni5971.87
Dzwerani5,96414.12
Fondwe1,7984.18
Gaba6,34010.44
Gonani3721.48
Gondeni A5,3914.96
Gondeni B1,4713.10
Ha-Lambani3,45018.68
Ha-Matsika1,1201.68
Ha-Radali2,0522.79
Hatshisele4,3823.20
Itsani11,4736.89
Khakhanwa1,3551.62
Khakhu1420.88
Khalavha3,2375.97
Khambela650.52
Khubvi10,27111.50
Kruger National Park552935.88
Lambani1,8813.92
Lamvi1,5309.83
Lufule1,6171.38
Lukalo1,5322.75
Lutomboni5290.75
Luvhimbi2,2968.50
Lwamondo20,21820.72
Mabokoro5450.41
Madzimu5,2133.80
Mahunguhwi3942.54
Makahlule1,8651.73
Makhumbe561.17
Makhuvha A1,0502.29
Makhuvha B5,3945.05
Makonde6,07712.59
Makovha2,0832.36
Makumbane2,2192.33
Makwarani8675.36
Malamangwa4952.86
Malamhala1,2111.00
Malavuwe2,3622.78
Manamane2,8973.71
Maname2040.93
Mandala3,0783.51
Manele1,6581.60
Mangondi A2,3735.33
Mangondi B1,2751.88
Manyuwa1351.29
Manzemba6081.26
Mapate3,6083.57
Maranzhe1,7643.61
Maraxwe9431.03
Mashawana5511.21
Masiwane1,2571.98
Matangari4,0627.63
Maungani7,2717.487
Mavhuwa551.12
Mavunde1,5733.84
Mbahe9822.99
Mbahela8520.81
Mbilwi5,0773.73
Mianzwi1,9282.39
Milaboni3430.81
Mphego3,0032.36
Mubvumoni2,0865.15
Mudunungu1,3661.35
Mudzidzidzi4001.08
Muhotoni6720.73
Muhuyu6981.25
Mukhomi3,8103.24
Mukomasiandu7641.28
Mukondeni611.09
Mukula8,20910.41
Mukumbani2,4313.04
Mulenzhe2,5669.03
Munangwe3650.46
Muraga1,4722.29
Mushiru6471.21
Mutoti9041.85
Mutshenzheni1,0623.61
Mutshetshe6731.05
Mvelaphanda1,5631.11
Nghomunghom1,7991.20
Ngovhela6,2967.82
Ngudza2,8553.74
Ngwenani6,2547.15
Phiphidi9,7959.99
Phugeni1,5121.35
Sambandou8262.03
Saselamani3,7271.84
Shanzha6313.05
Shayandima10,2596.15
Siambe2,5653.29
Sindande701.38
Sterkstroom390.05
Tambaulate2690.85
Thathe Vondo940.65
Thembaluvhilo430.09
Thenzheni1,8452.62
Thohoyandou69,45342.62
Thononda1,9442.43
Thulamela NU1,3992140.39
Tshabvuma2,1681.93
Tshamutavha1840.81
Tshamutilikwa8141.06
Tshaulu2,0772.49
Tshiavha1260.09
Tshidimbini2,5012.47
Tshidzate7810.81
Tshidzini3,8527.22
Tshidzivhe8452.19
Tshififi2,4684.15
Tshifudi2,3433.47
Tshihalwe5680.78
Tshiheni1,4354.97
Tshiiwani2271.10
Tshikambe4711.16
Tshikhudini1,4641.29
Tshikombani4,0844.29
Tshikonelo4,8097.20
Tshikovha2,0741.75
Tshikunda2,1772.93
Tshikweta8140.54
Tshilapfene1,4952.01
Tshilungoma2,5263.13
Tshilungwi6631.40
Tshiombo1,4151.58
Tshipako8002.17
Tshirenzheni1,2482.08
Tshisahulu7,3425.97
Tshisinise810.17
Tshitanini2271.02
Tshitavha2,1233.51
Tshitereke5,7887.40
Tshithuthuni2,0312.84
Tshivhilidulu1,3392.35
Tshivhilwi4,3345.00
Tshivhulani2,6752.13
Tswera1,0012.23
Tswinga3,9486.41
Vhudimbilu6581.64
Vhufuli3,6264.23
Vhurivhuri2,2157.49
Vhutalu4300.93
Vondo7661.98
Vondwe6,5215.95
Xaswita6800.84

Politics

The municipal council consists of eighty-one members elected by mixed-member proportional representation. Forty-one councillors are elected by first-past-the-post voting in forty-one wards, while the remaining forty are chosen from party lists so that the total number of party representatives is proportional to the number of votes received. In the election of 1 November 2021 the African National Congress won a majority of 71 seats on the council.
The following table shows the results of the election.

Mismanagement

The Makhuvha Sports Complex was opened in 2012 at a cost of R22 million. It consists of soccer grounds, a stadium and two swimming pools. However, the two swimming pools were never used, and as of November 2025, the pitch is overgrown.