Thameslink is a main line route on the British railway network, running from,,,,, and via central London to,,, Rainham,,, and. The initial network opened as a through service in 1988 and, as of 2025, currently calls at 135 stations in regular service. The entire route is currently operated by Govia Thameslink Railway. A part of the route, from to, runs 24hours a day, except on early Sunday mornings and during maintenance periods.
The Thameslink Programme was a major £7billion scheme to increase capacity on the central London section by accommodating more frequent and longer trains, and providing additional routes and destinations. The programme was divided into three key phases, with the final Key Output 2 introducing world-first Automatic Train Operation technology over European Train Control System Level 2, enabling 24 trains per hour through the core section. The new services began operating in 2018, though the full projected timetable of 24 trains per hour has never been achieved. In 2016, new trains started operating on the route and replaced the, and trains which were withdrawn and transferred elsewhere.
Passenger services on the Thameslink route, along with all others currently operated by Govia Thameslink Railway, are due to transfer to the publicly owned operator Thameslink Southern Great Northern on 31 May 2026.

Route

Much of the original route is over the Brighton Main Line and the southern part of the Midland Main Line, plus a suburban true loop serving Sutton. A branch via the Catford Loop Line to Sevenoaks was added in 2012. Sections to Peterborough on the East Coast Main Line, Cambridge via the Cambridge Line, Horsham on the Arun Valley line and Rainham via Greenwich were added in 2018. East Grinstead and Orpington are also served during peak hours.
The route through central London is via St Pancras International for connections to Eurostar and the East Midlands;, for London Underground Circle, Metropolitan and Hammersmith & City lines, and the Elizabeth line;, which replaced the demolished Holborn Viaduct station and has a southern entrance serving Ludgate Circus;, for main-line rail services and the Underground District and Circle lines; and for main-line links into Kent and Sussex and the Underground Northern and Jubilee lines. on Pentonville Road closed on 8 December 2007.
Trains operating the "main line" service include first-class accommodation; those operating from Luton, St Albans and Kentish Town to Sutton, Sevenoaks and Orpington are usually standard class only. When Govia operated the original Thameslink franchise these services were designated "Thameslink CityFlier" and "Thameslink CityMetro" respectively, but First Capital Connect dropped this branding. Govia Thameslink Railway now refers to these services as Route TL1 and Route TL2/TL3 respectively.

Services

Off-peak


The Monday–Friday off-peak service pattern, with frequencies in trains per hour, includes:
RouteCalling at
to 2
Bedford to Three Bridges via Redhill2
  • In the evening, this service only runs between Luton and Three Bridges
to via Redhill2
Cambridge to 2
London Blackfriars to via Catford and Otford2
Luton to via Greenwich2
  • In the evening, this service only runs between Kentish Town and Rainham
  • St Albans City to via 2
  • Services then continue to/from St Albans City via Mitcham Junction
  • St Albans City to Sutton via 2
  • Services then continue to/from St Albans City via Wimbledon
  • Peak hours


    During peak hours, the two trains per hour London Blackfriars to Sevenoaks service is extended through the 'core section' to/from , with extra calls at City Thameslink, Farringdon, St Pancras International, Finsbury Park,,,, and.
    As well as these services, during peak hours, several extra trains in each direction run to/from , all calling at in lieu of stations from St Mary Cray to Bat & Ball.
    In addition, there are seven trains per day in each direction that operate to/from , which, after calling at South Croydon, call at,,,,,, and.
    During peak hours, Peterborough to Horsham services call at Faygate between Ifield and Littlehaven, providing the primary service to this station.
    During the morning peak hours only, southbound Peterborough to Horsham services call at Knebworth.
    There are also three extra trains throughout the evening peak hours that operate from Gatwick Airport to Bedford in that direction only, calling at various stations.

    History

    Conceptual origins and post-war planning (1941–1970s)

    The strategic concept for a north–south through-running railway in London has deep historical roots, predating the Thameslink name by decades. Passenger services operated across London through the Snow Hill tunnel from mid-Victorian times until World War I, when services were withdrawn as inner-London traffic shifted to buses and trams.
    On 14 June 1941, railway manager George Dow proposed in an article in The Star a series of electrified, underground main-line routes to interconnect London's termini, arguing that "London suburban lines cannot play their full part... until they have been interconnected across London and electrified". This vision was further developed in the post-war County of London Plan and Greater London Plan. A 1949 working party identified a high-priority "Route A" that closely resembled the future Thameslink, designed to integrate suburban services and relieve Underground congestion. These ambitious plans were shelved due to post-war austerity, and the Snow Hill Tunnel route remained open only for cross-London freight trains until 1970.
    Overhead electrification, completed in 1982, allowed the northern section to run as the Midland City Line from Bedford via the Midland Main Line to St Pancras, and via the City Widened Lines to Moorgate.

    "Snow Hill Link": a pragmatic revival (1980s)

    The concept was revived in the early 1980s as a pragmatic, low-cost project, driven by the new Network SouthEast sector of British Rail. Established in 1986 under director Chris Green, NSE moved away from a geographically based management structure towards a business-led approach focused on customer markets and reducing public subsidy. The reactivation of the disused Snow Hill Tunnel was identified by NSE as a key project that could better utilise existing assets and create new travel opportunities. A 1984 feasibility study commissioned by the Greater London Council had found that the tunnel could be reopened for as little as £7–12 million.
    The project faced significant institutional resistance. London Transport initially blocked the Parliamentary legislation required for the project, officially due to a dispute over land at Farringdon, but with the "suspicion... that it fears extra competition." An editorial at the time called for the Transport Secretary to "bang BR and LT heads together to get this scheme on the rails as fast as possible." Ultimately, the project received government approval with the passage of the British Rail Bill in 1986, which provided for the reopening and electrification of the tunnel to link the Midland and Southern Regions.

    1988 launch and initial impact

    The Snow Hill tunnel was re-opened by British Rail to passenger trains after 72years, with the first Thameslink services beginning in May 1988. Marketed as a solution to the "dodge-the-chaos" strain of changing trains in central London, the service was an immediate success. Passenger demand quickly quadrupled initial projections, leading to severe overcrowding by 1998. The new link also had a significant economic impact, with one contemporary report noting it led to a "home price boom" in areas north of London like St Albans.
    On 29 January 1990, the section between Blackfriars and Farringdon was temporarily closed to permit the construction of a new alignment. The route through the site of the long-closed Ludgate Hill station, over Ludgate Hill to Holborn Viaduct was abandoned and demolished. The replacement route under Ludgate Hill was opened on 29 May 1990 by the Network SouthEast concurrently with station, which was initially called St Paul's Thameslink but was renamed in 1991 to avoid confusion with St. Paul's Underground station, about away.
    King's Cross Thameslink on Pentonville Road closed on 8 December 2007, when the Thameslink platforms at nearby St Pancras opened.

    Service evolution

    In the south the services divide: many main-line trains run almost due south through London Bridge to East Croydon and many continue to Brighton, but the other routes and branches evolved, as follows:
    • From 1988 to 1991 such trains went variously
    • *via Bromley: to Orpington or to Sevenoaks, or;
    • *via Herne Hill and East Croydon to Purley.
    • From 1991 to 1994, such trains went only via Elephant & Castle and Streatham to West Croydon, Wallington, Sutton, Epsom, Leatherhead and Effingham Junction, to Guildford.
    • From 1994 to 1995 such trains terminated at West Croydon.
    • *From the latter year such trains have run "to and from" a nominal furthest point of a true circular loop, Sutton, the Sutton loop calling at stations including Mitcham Junction, Streatham and Wimbledon.
    • From 2018 the service was greatly recast and expanded following the completion of the Thameslink programme:
    • *A regular service to Rainham has been added.
    • *A regular service to Horsham has been added.
    • *In the north the present termini of the trains are Luton, Bedford, Cambridge, Peterborough, St Albans and in peak hours, Welwyn Garden City.