Tengah Plantation MRT station
Tengah Plantation MRT station is a future elevated Mass Rapid Transit station on the Jurong Region Line in Tengah, Singapore, set to open in 2028.
History
On 9 May 2018, the Land Transport Authority announced that Tengah Plantation station would be part of the proposed Jurong Region Line. The station would be constructed as part of Phase 2, a branch line consisting of 7 stations branching from Tengah to Pandan Reservoir. Phase 2 was expected to be completed in 2027. However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2028.The contract for the design and construction of Tengah Plantation station was awarded to a joint venture between John Holland Pty Ltd and McConnell Dowell South East Asia Pte Ltd for S$265.4 million in March 2020. The contract included the design and construction of the Tengah Park and Bukit Batok West stations and associated viaducts.