Taki Dam
Taki Dam is a gravity dam on the Tadami River, east of Tadami in Fukushima Prefecture, Japan. Surveys for the dam were carried out in 1958, construction began in 1959 and the dam was complete in 1961. The primary purpose of the dam is hydroelectric power generation and it supports a 92 MW power station consisting of 2 x 46 MW Kaplan turbines. The dam is tall and long. It creates a reservoir with a capacity, of which is active for power generation. The dam's spillway is controlled by four sluice gates and has a discharge capacity.