Taipa line
The Taipa line is the first line in Macau Light Rapid Transit. The line initially opened on 10 December 2019, providing service between and as the first phase of the Taipa line. The automated guideway transit line has a U-shaped route within the island of Taipa and currently connects 13 stations; a link to Macau Peninsula officially opened on 8 December 2023.
Timeline
After more than seven years of construction, the Taipa line between Ocean and Taipa Ferry Terminal, previously known as Macau-Taipa Line Phase I, began operations on 10 December 2019, serving a total of 11 stations with 9.3 km in length.The system closed on 19 October 2021 for six months to replace all of high voltage cables.
The Taipa–Barra extension of 3.4 km opened on 8 December 2023, with service first covering Macau Peninsula.
Union Hospital station opened on 1 September 2024, providing a platform for interchange with the Seac Pai Van line opening on 1 November 2024.