Tadami Line


The Tadami Line is a scenic railway line in Japan operated by East Japan Railway Company. It connects Aizu-Wakamatsu Station at Aizuwakamatsu in Fukushima Prefecture with Koide Station at Uonuma in Niigata Prefecture.
The line opened in discontinuous stages between 1928 and 1971. Because of trouble financing rainstorm damage repairs, the line had no rail service between and station from July 2011 until October 2022. During this time, a replacement bus operated between Aizu-Kawaguchi and Tadami. Full service on the line resumed on 1 October 2022.

Services

All trains are local services, with approximately eight to nine trains in each direction per day. Only three round-trips operate over the entire line, and some seasonal trains operate through onto the line from the Ban'etsu West and Jōetsu lines. Due to the many curves on the line trains take over four hours to traverse its 135.2 km length.

Station list

  • All trains stop at every station.
  • Trains can pass each other at stations marked "◇", "∨", "∧"; they cannot pass at those marked "|".

History

Openings

The eastern section of the line from to opened in 1928. The eastern section was extended to in 1941 and to in 1956. At that time, the Tagokura Dam was under construction and a light railway was built to link Aizu-Kawaguchi with the construction site in order to transport construction material. In 1963, after the dam was completed, the construction railway was upgraded and opened to as part of the eastern section.
In the meantime, the western section of the line, from to, had opened in 1942. In 1971, the two sections were connected with the opening of the passenger only line between Oshirakawa and Tadami.

Closures

Freight services ceased between 1980 and 1982.
Damage from heavy rain storms in July 2011 forced the section of the line between and to be closed. The section between and Ōshirakawa was reopened on 1 October 2012, but the restoration of the remaining section between Aizu-Kawaguchi and Tadami proved more problematic. Eventually, JR East reached an agreement with Fukushima Prefecture under which the prefecture would buy the rail infrastructure and land while hiring out its operation to JR East. After 11 years with a replacement bus service, the closed section resumed operations on 1 October 2022.
Tagokura Station, located between Ōshirakawa and, was closed in 2013. Kakinoki Station, between and, was closed in 2015. Both of these station closures were due to very low usage.

Rolling stock

Former