Sungai Buloh station
The Sungai Buloh station is an integrated train station serving the suburb of Sungai Buloh in Selangor, Malaysia. It is located to the northwest of the Malaysia's capital city Kuala Lumpur.
It is an interchange station, with one section catering to KTM Komuter's and KTM ETS services, and another section for the . However, there is no paid-area integration between both sections as the two services use different ticketing systems and are operated by two different companies. The newly built integrated station was opened on 16 December 2016 together with the opening of the first phase of the MRT Kajang Line.
The station was the northern terminus of the MRT Kajang Line until October 2021, after which, the MRT portion of the station was closed along with and until the opening of the MRT Putrajaya Line. This was done to allow the transfer of the three MRT stations to the newly completed MRT Putrajaya Line, which officially opened on 16 June 2022.
Location
The station is located north of Jalan Kuala Selangor near the intersection with Jalan Sungai Buloh, and also Jalan Hospital. The station is located at the same location as the former Sungai Buloh railway station, part of which structure is still being used and integrated with the new station.History
First station
The first Sungai Buloh railway station opened in 1892 when the section of the main railway line, now the KTM West Coast railway line between Batu Junction and Rawang was opened.Old KTM Komuter station
The station underwent refurbishment as part of the Klang Valley electrification and double tracking prooject which saw the station becoming one of the stations of the new KTM Komuter service in 1995. The station was originally on the - line until 2016 when a revamp of the KTM Komuter service saw the station serving the, with trains running between and.The station was built with four tracks, with two side platforms serving the two outer tracks, and the two inner tracks serving as bypass tracks for freight trains that did not stop at the station. A pedestrian overhead bridge, which later had lifts to make the bridge disabled-friendly, linked the two platforms. The main entrance together with the main station building was located on the south-bound platform.
In 2010, KTM ETS services were introduced to the station and has been serving the station ever since.
Integrated interchange station
When construction of the Klang Valley Mass Rapid Transit project began in 2010, the MRT station was designed to be one of four interchange stations between the MRT Kajang Line and the KTM Komuter railway network. The other interchange stations are, and.The new station was constructed next to then existing KTM station building, occupying what was previously the at-grade open-air car park. The MRT section and common concourse of the station, which is partially over KTM tracks, was built while the KTM station remained in-operation throughout the construction period.
The integrated station opened as part of the opening of Phase One of the MRT Kajang Line on 16 December 2016.
With the completion and opening of the new integrated station, the old KTM station structure was dismantled. The KTM ticketing office and other offices were relocated from the old station to the common concourse of the new station building. Only the original KTM station platforms were retained, while the old entrance at the southbound platform was sealed off. The platforms were renovated to enable access to the new KTM concourse.
Park and ride facility
As part of the construction of the MRT Kajang Line, a six-storey multi-storey park and ride facility was also constructed at this station. The facility has 1,236 parking bays for cars and 258 for motorcycles. The parking charge is RM4.30 per day far cars and RM1.10 for motorcycles. Parking can only be paid by using Touch 'n Go cards.Train services
The Sungai Buloh station is served by the following train services:- Keretapi Tanah Melayu
- * KTM Komuter
- * KTM ETS Express, Platinum and Gold trains
Bus services
Feeder bus services
During the opening of the MRT Kajang Line, feeder buses also began operating linking the station with several housing areas and villages in and near Sungai Buloh. The feeder buses operate from the station's feeder bus hub accessed via Entrance A of the station. Four feeder bus routes were introduced during the opening of the MRT station in 2016.. Feeder bus route T105 was introduced on 1 December 2017. Two additional feeder bus routes, T154 and T155, were introduced from December 2023, and ran on a trial period until September 2024.| Route no. | Origin | Destination | Via |
| T100 | Sungai Buloh | Hospital Sungai Buloh UiTM Sungai Buloh | Jalan Hospital Hospital Sungai Buloh UiTM Sungai Buloh |
| T101 | Sungai Buloh | Bukit Rahman Putra | Jalan Hospital Jalan Kusta Kampung Melayu Sungai Buloh Persiaran Bukit Rahman 3 Persiaran Bukit Rahman Putra 1 Jalan Besar Bandar Baru Sungai Buloh Jalan Kuala Selangor |
| T102 | Sungai Buloh | Kampung Paya Jaras Kubu Gajah Aman Suria | Jalan Kuala Selangor Jalan Paya Jaras Tengah Jalan Kubu Gajah |
| T105 | Sungai Buloh | Matang Pagar | Jalan Kusta Jalan Kampung Melayu Sungai Buloh Jalan Matang Pagar Jalan SP 4 Jalan SP 17 |
| T154 | Sungai Buloh | Kuang | |
| T155 | Sungai Buloh | Kota Puteri |