Sumed pipeline


The Sumed Pipeline is an oil pipeline in Egypt, running from the Ain Sokhna terminal in the Gulf of Suez, the northernmost terminus of the Red Sea, to offshore Sidi Kerir port, Alexandria in the Mediterranean Sea. It provides an alternative to the Suez Canal for transporting oil from the Persian Gulf region to the Mediterranean.

History

The project for an oil pipeline from the Red Sea to the Mediterranean commenced after the extended closure of the Suez Canal following the Six-Day War in June 1967. Establishment of the pipeline company was agreed in 1973 between five Arab governments. The Sumed pipeline was opened in 1977.

Technical description

The Sumed pipeline is long. It consists of two parallel lines of diameter. Its capacity is. In 2009 it carried.

Operator

The pipeline is owned by the Arab Petroleum Pipeline Company/Sumed Company, a joint venture of Egyptian General [Petroleum Corporation|EGPC], Saudi Aramco, IPIC, three Kuwaiti companies, and QatarEnergy.

Proposed extension

An extension of the Sumed is being considered. The proposed extension would traverse the Red Sea from Ain Sukhna to the Saudi coast near Sharm al Sheikh, and from there to the terminal of Saudi Arabia's main east-west pipeline in Yanbu.