Songgang station


Songgang station is an interchange station between Line 6, Line 11 and Line 12 of the Shenzhen Metro. Line 11 platforms opened on 28 June 2016, Line 6 platforms opened on August 18, 2020 and Line 12 platforms opened on 28 December 2024.

Station layout

Entrances/exits

The station had 6 points of entry/exit when Line 6 and Line 11 opened. When Line 12 opened, 3 new points of entry/exit were constructed. The entrances for both parts are not connected. The station has bus stops at Exits C and G. Exits C, G, H and K are accessible via elevators.A: Bao'an BoulevardB: Bao'an Boulevard C: Bao'an Boulevard, Shajiang Road D: Xitou Industrial 4th RoadE: Bao'an BoulevardF: Bao'an BoulevardG: Shajiang Road H: Shajiang Road J: Shajiang Road K: Shajiang Road L: Shajiang Road