Solothurn–Moutier railway line
The Solothurn–Moutier railway line is a 22 kilometre-long standard-gauge line in Switzerland, connecting Solothurn via the Weissenstein Tunnel to Moutier in the Bernese Jura. At the start of operations in 1908, the Emmentalbahn took over operations of the line, which was owned by the Solothurn-Münster-Bahn. In 1997, it merged with the Emmental-Burgdorf-Thun-Bahn and the Vereinigte Huttwil-Bahnen —which already worked together for the operation of trains—to form the Regionalverkehr Mittelland, which then took over the operation of the line. Since a merger in 2006, the line has been part of BLS, while passenger services have been operated by the Swiss Federal Railways since 2010.
History
Construction
The constituent general meeting of the SMB took place on 30 April 1899, but for various reasons including difficulties in securing funding, construction did not begin until 1903. Construction finally started on 28 December 1903. Construction of the line proved to be difficult as, on the one hand, the terrain to be built on was unstable and it was repeatedly affected by landslides, and, on the other hand, the construction of 84 significant structures was required on the short line. The building material for these structures mainly came from the quarries in Lommiswil and Gänsbrunnen. The largest construction site on the line was the future station area in Oberdorf, because the Weissenstein Tunnel was built from there. As occurred at other tunnel construction sites in Switzerland, a temporary settlement was built nearby for the tunnel workers. During the construction of the line there were two fatalities at the Geissloch viaduct construction, but the exact causes are unknown. When operations began in 1908, construction work had not been completed. In particular the problems with the landslides had not been solved, which meant that the work was not completed until 1909.First years of operation
Because the operation of the line would not have been profitable due to its short length, the Solothurn-Münster-Bahn transferred operations on to the line before the inauguration of the line to the Emmentalbahn, which also terminated in Solothurn. The line was opened on 3 August 1908.Construction had not been completed due to landslides and various other interruptions to works. Traffic initially developed well, mainly due to freight traffic, which mainly served Von Roll and the Swiss Army. The beginning of the First World War also strongly affected operations on the line, so passenger services had to be severely restricted and the planned freight operations were completely abandoned because more extensive operations were no longer possible due to sharply increased coal prices. Although the timetable of 1921 showed the same number of services as before the war, the frequencies decreased, mainly because road transport was gradually becoming competitive. The line retained a certain importance for through traffic.