Shuixi station


Shuixi station is an interchange station between Line 7 and Line 21 of the Guangzhou Metro. Line 21 opened on 20 December 2019, whilst Line 7 opened on 28 December 2023.

Station layout

The Line 21 station has an underground island platform, along with 2 bypass tracks next to the stopping tracks. The Line 7 station has a separate island platform underneath Line 21. There are 6 exits, lettered A, B, C, D, E and F. Exits A, C and F are accessible. Exits A, B and D are located on Shuixi Road, and exits C, E and F are located on Luosuizhi Street. Exit A provides interchange with Huangpu Tram Line 1.

Entrances/exits

The station has 6 points of entry/exit, with Exits C and F being accessible via elevators.
When the station initially opened, Exits A and B were set up on the south side of Shuixi Road, while Exit D on the north side of Shuixi Road was opened on 31 May 2022. After the Line 7 station opened, Exits C, E and F were added to this station, of which Exits C and F were additionally equipped with elevators to improve accessibility.
  • A: Shuixi Road
  • B: Shuixi Road,
  • C: Luosui Straight Street,
  • D: Shuixi Road
  • E: Luosui Straight Street
  • F: Luosui Straight Street

History

Shuixi Station was originally planned as the northern terminus of Line 4. At the end of 2010, the northern extension of the original Line 4 was singled out and extended to both ends to become Line 21. In order to cooperate with the express positioning of Line 21, this station was cancelled for a time; Later, the setting was resumed during the EIA stage, and construction was finally implemented.
In 2016, the second phase of Plan 7 was extended to Shuixi Station as the terminal station, and then further extended to Shuixibei Station. Line 21 was not initially scheduled have a transfer with Line 7, but at the end of 2016, the station design was changed to include a reserved transfer point with Line 7.
On 30 April 2019, the "three rights" transfer was completed on Line 21 of this station. On 20 December of the same year, the station was opened with the opening of the remaining section of Line 21. In order to coincide with the upcoming opening of the second phase of Line 7, the express train of Line 21 was adjusted to stop at this station since 29 August 2023.
In October 2023, the "three rights" transfer was completed at the Line 7 station. On 28 December 2023, the station part of Line 7 officially opened with the opening of the second phase of Line 7, and the station became a transfer station.