Ship-to-Shore Connector
The Ship-to-Shore Connector, also known as the LCAC 100 class, is a system proposed by the United States Navy as a replacement for the Landing Craft Air Cushion. It will offer an increased capacity to cope with the growing weight of equipment used by the United States Army and Marine Corps., the program is forecast to cost a total of US$4.054B for 73 hovercraft.
History
Several proposals have been made to replace the LCAC. In 2003, the Navy Transformation Roadmap set out plans to start R&D on a "Heavy Lift LCAC" project in 2005, but this was superseded by the LCAC "LCAC Replacement Tactical Assault Connector". In August 2010, the US Navy issued a Request For Proposals for a contract to design and build 72 SSCs. The contract would be worth up to US$4 billion. A contract for detailed design work and construction of the first test and training craft, was expected to be awarded in 2011.Proposals
- A team comprising Marinette Marine, Boeing, and Griffon Hoverwork
- A team comprising Textron Marine & Land Systems, Alcoa Defense, and L-3 Communications
- VT Halter
The first SSC was delivered on 6 February 2020.
Design
Although the design will be broadly similar to the LCAC, there will be several significant differences:- Two-person Fly-by-wire cockpit with joystick controls
- More powerful, more efficient engines
- Extensive use of composites and aluminum alloys for corrosion resistance
- Advanced skirt instead of a deep skirt for less drag and reduced craft weight
The SSC has a designed lifetime of 30 years.
The tenth SSC to be delivered will have the capability to launch vehicles into the water rather than travel to the beach. That ability will then be retrofitted to the previous nine vessels.