Line 2 (Shenzhen Metro)
Line 2 of the Shenzhen Metro runs West–East from to. It opened on 28 December 2010. Line 2 merges into Line 8 at Liantang station, where trains continue service as Line 8 to Xichong station.
History
First stage
The first section of Line 2 runs from to, it is long, and these 12 stations are all underground. This section opened on 28 December 2010.Second stage
The second section runs from to, it is long, and has 17 stations. The second stage of Line 2 opened on 28 June 2011.Third stage
The third section runs from to, it is long, and has 3 stations. The third stage of Line 2 opened on 28 October 2020.Timeline
Service routes
- —
- —
Stations