Ring Road station
Ring Road is a station in Line 3 of Cairo Metro, that was opened as part of Phase 3B of the line on 1 January 2024 after construction began in late 2018. It is located above the Ring Road, spanning a government-owned area of, with a length of. The height above the Ring Road is, while the height above El-Qawmia street varies from 13 to 15 metres. Entrance is provided by 4 entrances.
The station has four levels from the street to the platforms, with access provided by stairs, escalators, elevators and pathways. There will also be a direct connection with the bus rapid transit through the platforms.