Rhode Island Convention Center
The Rhode Island Convention Center is an exposition center in downtown Providence, RI. Opened in 1993, it is the largest convention center in Rhode Island, with about of exhibition space, including a exhibit hall. It is connected by skybridges to the Amica Mutual Pavilion, and the adjacent Omni Hotels Providence Hotel">Providence, Rhode Island">Providence Hotel. The ground level features a main exhibition hall with 100,000 square feet, and the upper level has a ballroom and meeting halls. The building has a five-story glass front with a large space outside the meeting rooms and exhibit halls where visitors can gather and mingle. The center is operated by the Rhode Island Convention Center Authority, which also operates the Amica Mutual Pavilion and Veterans Memorial Auditorium.
History
Background
As far back as 1958, plans had been put forward to build a convention center. A 1970 planning document had included a civic and convention center, but when the Civic Center was built in 1973, convention and exhibition space was not included for cost reasons. The idea was revived in the late 1980s, and a Convention Center Authority was established in 1987 to look into the feasibility of building a convention center along with hotel and parking garage. In 1991, Governor Bruce Sundlun put his full support into the project, making it the centerpiece of a large state-funded construction project to revitalize Providence's downtown. His plan also included relocating the railroad, and building Waterplace Park and walkways along the city's rivers. Sundlun argued that a convention center would attract tourists and become an economic engine for the state.Construction
The Convention Center Authority purchased the Bonanza Bus Station and two parking lots to provide land. The bus station was demolished to make room for the Convention Center.Construction on the Center proceeded rapidly, despite the land being unstable; the site had been the location of the Great Salt Cove, which meant that pilings had to be driven deeper than originally anticipated. Despite this, the project opened on schedule. The north parking garage finished January 1993; the Convention Center and south garage were completed November 1993. The center held its ribbon cutting ceremony on November 24, 1993.
The adjacent Westin Hotel was completed in December 1994.