Australian Rail Track Corporation
The Australian Rail Track Corporation is an Australian Government-owned statutory corporation. It operates the largest rail network in the nation, spanning more than 9,600 kilometres across five states and 37 worksites.
ARTC continues to strengthen rail infrastructure across the country, including through Inland Rail, which is a 1,600km freight line under construction between Melbourne and Brisbane via regional Victoria, New South Wales and Queensland that will allow for double-stacked freight trains and better connect producers to markets.
History
In November 1996, the Australian Government announced a major rail reform package that included the sale of government-owned train operators Australian National and National Rail, and the establishment of ARTC to manage the sections of the interstate rail network which had been controlled by the two former organisations.ARTC was incorporated in February 1998, with operations starting in July 1998 when the lines managed by Australian National's Track Australia were transferred to it. These were the lines from Kalgoorlie to Port Augusta, Tarcoola to Alice Springs, Port Augusta to Whyalla, Adelaide to Broken Hill, Adelaide to Serviceton, and the Outer Harbor line in Adelaide. Its inaugural CEO was David Marchant.
In 2000, the Tarcoola to Alice Springs line was leased to the Asia Pacific Transport Consortium as part of the project to extend the line to Darwin.
Victoria
In 1999, ARTC signed a five-year deal with VicTrack, the rail manager for the Victorian government, to lease the standard gauge North East line from Albury to Melbourne and the Western standard gauge line from Melbourne to Serviceton. This was later extended for another 10 years, and in May 2008 for another 45 years.As part of the lease extension, the run-down and under-utilised broad-gauge line from Seymour to Albury, that paralleled the standard gauge line, was leased to ARTC and converted to standard gauge. Included was construction of the five-kilometre Wodonga Rail Bypass which eliminated 11 level crossings in that city.
In March 2009, the Portland line from Maroona to Portland would be leased to ARTC for 50 years, with $15 million to be invested in the line.
ARTC also manages the Oaklands railway line between Benalla, Victoria and Oaklands, New South Wales.
Western Australia
In 2001, ARTC was granted rights for fifteen years to sell access between Kalgoorlie and Kwinana, Perth, to interstate rail operators under a wholesale access agreement with the Western Australian track-lessee Arc Infrastructure.New South Wales
In September 2004, the Government of [New South Wales|New South Wales Government]-owned RailCorp leased its interstate and Hunter Valley lines to the ARTC for 60 years. The lines covered by the lease are:- Main South line between Macarthur and Albury
- North Coast line between Maitland and Border Loop
- Main North line between Broadmeadow and Werris Creek
- Broken Hill line between Parkes and Broken Hill
- Unanderra to Moss Vale line
- Sandy Hollow to Gulgong line
- [Stockinbingal–Parkes railway line|Cootamundra to Parkes line]
- Parkes to Narromine line
- Troy Junction to Merrygoen line
- $192 million to build the Southern Sydney Freight Line, a new dedicated southern access route for freight trains through the south-western Sydney metropolitan area from Sefton to Macarthur, opened in January 2013.
- $152 million to upgrade the Hunter Valley network, including track strengthening and $67 million to eliminate bottlenecks, increasing the capacity of the network from 85 million to over 100 million tonnes per year.
- $186 million to upgrade the Main South line from Macarthur to Albury. The investment improved signalling, extended the length of crossing loops and replaced the Murrumbidgee Bridge at Wagga Wagga to assist in reducing the transit times for freight trains between Sydney and Melbourne by three hours.
- $119 million for the North Coast line from Maitland to Border Loop including replacement of the 1920s signalling system between Casino and Border Loop assisting in reducing the travel time for freight trains between Sydney and Brisbane by up to 3.5 hours.
- $21 million for the Broken Hill line between Parkes and Broken Hill, including funds to raise height clearances allowing the passage of double-stacked container trains.
In July 2011, responsibility for the Mungindi line from The Gap to Boggabilla line was transferred from the Country Rail Infrastructure Authority to the ARTC.
In August 2012, RailCorp leased its Metropolitan Goods line from Port Botany to Sefton to the ARTC for 50 years.
Queensland
In January 2010, the Government of Queensland leased its standard-gauge line from Border Loop on the New South Wales border to Acacia Ridge, Brisbane to ARTC for 60 years.In February 2014, the Federal and Queensland governments agreed to investigate further incorporating Queensland into the national rail network. This ultimately did not proceed.
Responsibilities
ARTC does not operate any trains, but provides and maintains the infrastructure for train operators to run on. ARTC controls tracks in all mainland states. These were previously run by five separate state railways in an uncoordinated fashion that gave an advantage to road transport. By combining the infrastructure under one corporation it was expected that a more integrated and coordinated one-stop-shop would be created. It provides its own reporting numbers to trains that operate on its network. It also allows Commonwealth officers undercover privileges presenting as staff of ARTC.ARTC does not control any of the narrow gauge track in Queensland or South Australia, nor broad gauge track in Victoria. However it does control the Albion to Jacana freight line which has been partially converted to dual gauge for use as a passing lane, but is considered a main line on the broad gauge network. It was transferred from VicTrack in May 2009.
Owned corridors
- Adelaide to Serviceton
- Adelaide to Port Augusta and Kalgoorlie
- Port Augusta to Whyalla
- Crystal Brook to Broken Hill
- Tarcoola to Alice Springs — leased to Aurizon until 2047
- Dry Creek to Pelican Point
- Sefton to Macarthur
Leased corridors
- Melbourne to Albury
- Melbourne to Serviceton
- Maroona to Portland
- Port Botany to Sefton
- Macarthur to Albury
- Unanderra to Moss Vale
- Cootamundra to Parkes
- Parkes to Broken Hill
- Parkes to Narromine
- Troy Junction to Merrygoen line
- Broadmeadow to Brisbane
- Maitland to North Star
- Muswellbrook to Gulgong
Digital train control technology
Digital train control technology ARTC is helping lead a national effort to modernise how trains are managed across Australia’s various rail networks, including ongoing work to achieve rail interoperability.Following Australian Government direction in August 2025, ARTC is leading the national work on interoperability and digital train control technology in non-urban freight contexts for the national rail network. ARTC has been tasked with developing a business case that will set the direction for DTCT in Australia and the nation’s interoperability roadmap. This work will test the commercial and operational viability of DTCT systems, including the European Train Control System for non-urban freight and mixed networks.