Yangon International Airport
Yangon International Airport is the primary and busiest international airport of Myanmar. The airport is located in Mingaladon township, north of central Yangon. Many domestic Myanmar carriers and international airlines operate at Yangon International Airport. The airport is also colloquially known as Mingaladon Airport due to its location.
History
As RAF Mingaladon
During World War II, the airfield was called RAF Mingaladon and served as an operating base for fighter aircraft such as:- No. 60 Squadron RAF from February 1941 to February 1942 flying Bristol Blenheim I
- No. 67 Squadron RAF from October 1941 to March 1942 flying Brewster Buffalo and Hawker Hurricane IIs
- No. 135 Squadron RAF from January–February 1942 flying Hawker Hurricane IIs
- No. 681 Squadron RAF from June to September 1945 flying Supermarine Spitfire
- 3rd Squadron of 1st American Volunteer Group of the Chinese Air Force flying Curtiss P-40s
- Air Headquarters Burma Communication Squadron RAF
- Air Headquarters Burma Communication Flight RAF
- Air Headquarters Netherlands East Indies Communication Squadron RAF
- No. 221 Group Communication Squadron RAF
As Japanese airfield
During the Second World War, in 1941 the Japanese began their attack on Burma, including an air raid on Mingaladon. By 1942, the outnumbered Allied forces had retreated and the Japanese took over the airfield. Mingaladon was then used by the Japanese, and Japanese bombers based in Bangkok were moved forward to Mingaladon when there was a full moon. The British at the Wireless Experimental Centre in Delhi had decrypted BULBUL, the IJA air-to-ground code, and could predict Japanese air raids. On one occasion Allied nightfighters "got the lot and all night we could hear Mingaladon air base calling for its lost children".Becoming Yangon Airport
After World War II, Yangon Airport was built on the site of the former RAF Mingaladon in 1947 by the Calcutta Metropolitan Airports Authority. Once regarded as the best in Southeast Asia and the primary airport serving that region, the airport fell into disrepair and remained that way for decades, as new super hubs like Singapore Changi Airport, Kuala Lumpur Sepang, Bangkok Suvarnabhumi and Jakarta Soekarno-Hatta were built and superseded Yangon's facilities.In November 2012, Condor began flying seasonally to Frankfurt with Boeing 767s. The outbound flight from Yangon made a stop in Phuket, but the inbound one was direct. The airline cut the route at the end of the first season. Airport capacity was boosted to 6 million passengers per year in early 2016. Currently, there are plans to build a new, larger airport, Hanthawaddy International Airport, on a much larger site and somewhat away from Yangon.
Modernization
A modernization program was launched in April 2003 and resulted in a new terminal and an extended 3414 m runway.Designed by the Airport Development Division of CPG Corporation of Singapore, a new terminal was constructed at a cost of US$13.3 million by Asia World. It can handle 900 arriving and 900 departing passengers simultaneously. The design meets IATA service standards and complies with ICAO safety and security standards at a cost of SG$30 million. Other notable features include:
- Separate floors for arriving and departing passengers to lessen congestion
- Automated baggage handling system with an integrated check-in system
- Four air bridges, capable of handling four Boeing 747s
- Special lounges for use by government officials and business people
- A two-story parking garage with spaces for 340 vehicles
In 2013, a contract worth $150 million was awarded to a consortium led by an affiliate of Asia World to construct a new domestic terminal and expansion of airport apron.
The new international terminal opened in March 2016, with the previously existing international terminal being designated as T2. The new domestic terminal opened on 5 December 2016.
Terminals
Terminal 1
In August 2014, the old domestic terminal was demolished and construction began for the new six-story Terminal 1, which will handle international flights. The opening ceremony was held on 12 March 2016. After the opening of Terminal 1, the airport can handle 6 million passengers annually, as opposed to 2.7 million before.Terminal 2
After the opening of Terminal 1, the former International Terminal was renamed "Terminal 2." The building was designed by the CPG Corporation of Singapore and constructed by the Asia World Company costing US$13.3million. The terminal can handle 900 arriving passengers and 900 departing passengers at the same time.Terminal 2 was closed in July 2018 to undergo extensive renovation. All international flights now operate from Terminal 1.
Terminal 3
Terminal 3, which is used for domestic flights, opened on 5 December 2016, replacing the old domestic terminal, which was demolished in August 2014.Guard of Honour Building (VIP terminal)
The former VIP terminal was temporarily used as the domestic terminal until Terminal 3 was completed. The Guard of Honour Building was demolished to make way for a connector between Terminals 1 and 2.Statistics
Top destinations
| Rank | Destinations | Frequency |
| 1 | ![]() Accidents and incidents
Airport shuttle busThe Yangon Bus Service provides airport shuttle bus line that stop at 13 bus stops between Yangon International Airport and Yangon Central Railway Station. The buses make stops at Yangon International Airport, 8 Mile, Nawade, Kaba-Aye Pagoda, Lanni, Hanmithit, Shwegondine, Bahan 3rd Street, Kyauktaing, Yauklan and Sule Pagoda. Stops on the return journey include Sule, Yangon Railway Station, Zoological Gardens, Bahan 3rd Street, Shwegondine, Lanni, Kaba-Aye Pagoda, Nawade, 8 Mile and the airport. |