Purwakarta–Cileunyi Toll Road


Purwakarta–Bandung–Cileunyi Toll Road or shortened as Purbaleunyi Toll Road is a controlled-access toll road in Indonesia, connecting Purwakarta Regency, West Bandung, Cimahi and the city and regency of Bandung.
Before fully connected, this toll road segment was Padalarang–Cileunyi only. From 2003 until 2005, the segment of Cikampek–Padalarang was constructed. Since then, this toll road is part of Jakarta–Cikampek Toll Road. The junction of both toll roads is located at kilometer 67. This toll road is famous for its scenic views, as well as notoriously known for its accidents on the Cipularang Segment.

Sections

Kilometres 67–122

The Purbaleunyi toll road starts from kilometre 67. This section is known as Cipularang. It has a length of. It connects Purwakarta Regency and West Bandung. This segment runs to a hill without any electricity, thus solar street lights have been installed. This section is notoriously known for its accidents, especially around kilometres 92-97. This section ends at Padalarang.
For technical aspects, Cipularang Toll Road has 2 lanes in each direction. Unfortunately, this toll road may sometimes be closed for heavy vehicles traffic due to the difficult terrain to repair its condition. The famous event for this closure is Cisomang Bridge pillars break.
On 18 December 2022, Darangdan Toll Gate has been opened functionally as an access to Purwakarta Regency and West Bandung Regency. The toll gate was planned to be opened until 8 January 2022, and has remained operating since.
This toll road holds the record of longest exit-to-exit spans in Indonesia with Padalarang to Jatiluhur spans for 38 km without any other exits before being surpassed by Pematang Panggang–Kayuagung Toll Road in Sumatra, where the spans between Pematang Panggang and Kayuagung spans 91 km without any exits between them.

Kilometres 122–155

This section is known as Padaleunyi. It has length of for mainline and a grand total of for Bandung City Main Links. It crosses South Bandung, also acts as the third southern ring roads of Bandung Metropolitan Areas; the second ring road is Soekarno-Hatta Street, Bandung, while the first ring road consists of many city roads. It ends at Cileunyi, although there's an extension project to go to Sumedang and Kertajati International Airport via Cisumdawu Toll Road. For the future, this toll road will be used a main line for Southern Java toll roads network through Gedebage–Tasikmalaya–Cilacap Toll Road.
Famous destinations on this segment are:
From KM125 to KM150, Jakarta-Bandung High Speed Railway parallels this toll road.

Facilities

Rest areas

Note that the toll road goes east–west from KM122-KM155, while from KM67-KM122, the direction is suggested south–north.
KMDirectionToiletMosqueRestaurantConvenience StoreATMGas StationRest Area
72Northbound
72Southbound
88Northbound
88Southbound
97Northbound
125Westbound
147Eastbound
149Westbound

Bridges

KMNameLength
95Ciujung550 metres
101Cisomang252 metres
110Cikubang500 metres
110Cipada720 metres
117Cimeta400 metres