Petronas Towers
The Petronas Towers, also known as the Petronas Twin Towers and colloquially the KLCC Twin Towers, are an interlinked pair of 88-storey supertall skyscrapers in Kuala Lumpur, Malaysia, standing at. From 1996 to 2004, they were the tallest buildings in the world until they were surpassed by the Taipei 101 building. The Petronas Towers remain the world's tallest twin skyscrapers, surpassing the original World Trade Center towers in New York City, and were the tallest buildings in Malaysia until 2021, when they were surpassed by Merdeka 118. The Petronas Towers are a major landmark of Kuala Lumpur, along with the nearby Kuala Lumpur Tower and Merdeka 118, and are visible in many places across the city.
History and architecture
The Petronas Towers' structural system is a tube in tube design, invented by Bangladeshi-American architect Fazlur Rahman Khan. Applying a tube-structure for extremely tall buildings is a common phenomenon.The 88-floor towers are constructed largely of reinforced concrete, with a steel and glass facade designed to resemble motifs found in Islamic art, a reflection of Malaysia's Muslim religion. Another Islamic influence on the design is that the cross section of the towers is based on a Rub el Hizb, albeit with circular sectors added to meet office space requirements. The circular sectors are similar to the bottom part of the Qutb Minar.
File:Qutub Minar danibaba5.jpg|thumb|150px|The cross section of the Petronas Towers is based on a Rub el Hizb, albeit with circular sectors similar to the bottom part of the Qutb Minar.
The towers were designed by Argentine-American architect César Pelli. A distinctive postmodern style was chosen to create a 21st-century icon for Kuala Lumpur, Malaysia. Planning on the Petronas Towers started on 1 January 1992 and included rigorous tests and simulations of wind and structural loads on the design. Seven years of construction followed at the former site of the original Selangor Turf Club, beginning on 1 March 1993 with excavation, which involved moving 500 truckloads of earth every night to dig down below the surface.
The construction of the superstructure commenced on 1 April 1994. Interiors with furniture were completed on 1 January 1996, the spires of Tower 1 and Tower 2 were completed on 1 March 1996, 3 years after its construction was started, and the first batch of Petronas personnel moved into the building on 1 January 1997. The building was officially opened by the Prime Minister of Malaysia, Tun Dr. Mahathir bin Mohamad, on 31 August 1999. The twin towers were built on the site of Kuala Lumpur's race track. It was the tallest structure in Malaysia at the time of its completion. Test boreholes found that the original construction site effectively sat on the edge of a cliff. One half of the site was decayed limestone while the other half was soft rock. The entire site was moved to allow the buildings to sit entirely on the soft rock. Because of the depth of the bedrock, the buildings were built on the world's deepest foundations. 104 concrete piles, ranging from deep, were bored into the ground. The concrete raft foundation, comprising of concrete was continuously poured through a period of 54 hours for each tower. The raft is thick, weighs and held the world record for the largest concrete pour until 2007. The foundations were completed within 12 months by Bachy Soletanche and required massive amounts of concrete.
As a result of the Malaysian government specifying that the buildings be completed in six years, two construction consortia were hired to meet the deadline, one for each tower. Tower 1, the west tower was built by a Japanese consortium led by the Hazama Corporation while Tower 2, the east tower was built by a South Korean consortium led by the Samsung C&T Corporation.
Early into construction a batch of concrete failed a routine strength test causing construction to come to a complete halt. All the completed floors were tested but it was found that only one had used a bad batch and it was demolished. As a result of the concrete failure, each new batch was tested before being poured. The halt in construction had cost US$700,000 per day and led to three separate concrete plants being set up on the site to ensure that if one produced a bad batch, the other two could continue to supply concrete. The sky bridge contract was completed by Kukdong Engineering & Construction. Tower 2 became the first to reach the world's tallest building at the time.
Due to the huge cost of importing steel, the towers were constructed on a cheaper radical design of super high-strength reinforced concrete. High-strength concrete is a material familiar to Asian contractors and twice as effective as steel in sway reduction; however, it makes the building twice as heavy on its foundation as a comparable steel building. Supported by 23-by-23 metre concrete cores and an outer ring of widely spaced super columns, the towers use a sophisticated structural system that accommodates its slender profile and provides 560,000 square metres of column-free office space. Below the twin towers is Suria KLCC, a shopping mall, and Petronas Philharmonic Hall, the home of the Malaysian Philharmonic Orchestra.
Notable events
- On 15 April 1999, Felix Baumgartner set the world record for BASE jumping by jumping off a window cleaning crane on the Petronas Towers.
- Thousands of people were evacuated on 12 September 2001 after a bomb threat the day after the September 11 attacks destroyed the World Trade Center towers in New York City. Bomb disposal squads found no explosives in the towers, but they nevertheless evacuated the premises. Workers and shoppers were allowed to return three hours later, around noon. No one was hurt during the evacuation.
- On the evening of 4 November 2005, a fire broke out in the cinema complex of the Suria KLCC shopping centre below the Petronas Towers, triggering panic among patrons. There were no reports of injuries. The buildings were largely empty, except the shopping mall, Suria KLCC, because of the late hour; the only people involved were moviegoers and some diners in restaurants.
- On the morning of 1 September 2009, French urban climber Alain "Spiderman" Robert, using only his bare hands and feet and with no safety devices, scaled to the top of Tower Two in just under 2 hours after two previous efforts had ended in arrest. In his first attempt on 20 March 1997, police arrested him at the 60th floor, 28 floors away from the "summit". His second attempt, on 20 March 2007, exactly 10 years later, was also stopped on the same floor, though on the other tower.
Anchor tenants
Petronas Towers 1 & 2 Floor Plan
''''Suria KLCC Mall Floor Plan
Features
Suria KLCC
is a upscale retail center at the foot of the Petronas Towers. It features mostly foreign luxury goods and high-street labels. Its attractions include an art gallery, an underwater aquarium and also a Science center. Boasting approximately 300 stores, Suria KLCC is touted as one of the largest shopping malls in Malaysia. The Petronas Philharmonic Hall, also built at the base of the towers, is frequently associated with Suria KLCC's floorspace. During holidays or celebration days, Suria KLCC is the top spot to see the decorations especially at the main entrances and also in Centre Court. It also promotes the uniqueness and beauty of Malaysia's cultural diversity towards the visitors.KLCC Park
Spanning below the building is the KLCC Park with jogging and walking paths, a fountain with incorporated light show, wading pools, and a children's playground.Skybridge
The towers feature a double decker skybridge connecting the two towers on the 41st and 42nd floors, holding the record for the highest 2-story bridge in the world. The skybridge also functions as a crucial design feature facilitating movement between the two towers during high winds. The bridge is above the ground and long, weighing. The same floor is also known as the podium, since visitors going to higher levels have to change elevators here. Dynamic analyses were performed and iterated to support the final design by studying the structural behavior of the twin towers to time-varying loads such as earthquakes and wind. The skybridge is open to all visitors, but tickets are limited to about 1,000 people per day, with around half available to be purchased online, and the other half obtained on a first-come, first-served basis. Petronas began selling tickets in 2010, eliminating free visits. Visitors can choose to opt for package one which is just a visit to the skybridge or go for package two to go to the skybridge and all the way to level 86. Visitors are only allowed on the 41st floor as the 42nd floor can only be used by the tenants of the building.The skybridge also acts as a safety device, so that in the event of a fire or other emergency in one tower, tenants can evacuate by crossing the skybridge to the other tower. The total evacuation triggered by a bomb hoax on 12 September 2001 showed that the bridge would not be useful if both towers need to be emptied simultaneously, as the capacity of the staircases was insufficient for such an event. Plans thus call for the lifts to be used if both towers need to be evacuated, and a successful drill following the revised plan was conducted in 2005.
There is a two hinged arch that supports the skybridge with arch legs, each long, that are bolted to level 29 of each of the towers. After being constructed on the ground, the skybridge was lifted into place on the towers over a period of three days in July 1995. Residing on the 41st and 42nd floors, the skybridge connects a conference room, an executive dining room and a prayer room.