Pen y Cymoedd
Pen y Cymoedd is a wind farm located between Neath and Aberdare in south Wales. It opened in 2017.
History
Development
Natural Resources Wales signed a lease agreement with Vattenfall of Sweden and its British-based subsidiary Vattenfall United Kingdom, to develop what will be the United Kingdom's highest altitude wind farm, on a site owned by Natural Resources Wales, previously the Forestry Commission Wales. The project has seen the installation of 76 turbines with a peak power of 228 MWp, that are planned to operate for 25 years, and to generate up to 0.6 TWh/yr, an amount enough to power up to 140 000 homes with an annual consumption of 4 266 kWh. The turbine manufacturer is Siemens Wind Power.During the planning process, Vattenfall agreed to contribute about £1.85m annually to a community fund and to invest £3m in a habitat restoration scheme, and the following parties contributed to the debate:
- Glyncorrwg Action Group: the wind farm will look down on the village of Glyncorrwg in the Afan Valley. Residents of the village campaigned against the development, which they claim would destroy the character of the landscape.
- Campaign for the Protection of Rural Wales: objected on the grounds of its potential impact on a sensitive peat habitat.
- Neath Port Talbot County Borough Council: the planning committee decided not to object to the scheme in January 2012, after councillors carried out a site visit, although they set a number of conditions.