Padi railway station
Padi railway station is one of the two, now defunct, railway stations of the extended southern arm of the Chennai Central–Arakkonam section of the Chennai Suburban Railway Network, the other one being Anna Nagar railway station. It served the neighbourhoods of Padi, Villivakkam, Korattur and Anna Nagar. The station is located at the junction of 100-feet Inner Ring Road—MTH Road, known as the Padi Junction. The station is being maintained by the Integral Coach Factory, the premier production unit of the Indian railways.
History
In 2003, a 3.09 km-long railway line, initially used by the Integral Coach Factory at Perambur for moving newly built coaches from shell to furnishing division of the factory, was strengthened at a cost of 72.9 million for operating passenger services. Two new stations, namely, Padi and Anna Nagar, were built and 13 existing bridges were renovated and the work was completed in five months. The railway station and the EMU services were inaugurated by the then Union Minister of State for Railways, A. K. Moorthy. Between 2003 and 2007, five suburban trains were being run from Anna Nagar to Chennai Beach via. In 2007, the service was discontinued due to construction of a rotary at the Padi junction replacing the level-crossing. Though the rotary was completed in 2009, services were not restored. However, in 2011, the railways planned to resume services in this section as a feeder service with six-car EMUs.The tracks and land on which the station is built were originally owned by the ICF. When the Southern Railway intended to operate trains to Padi and Anna Nagar stations, the ICF handed over the land to the Southern Railway. When the train services were withdrawn in 2007, the ICF reclaimed the land from the zonal railway. The tracks and the stations are now used by the ICF for moving spare parts to the manufacturing unit and back.
Patronage
The service during its operational years, however, had a low patronage.However, unlike the rest of the Chennai Suburban Railway network, there is only one line in this section. In addition, the traffic congestion resulting due to closure of a gate near the Padi railway station limited the operation to five pairs of EMU services between Chennai Beach and Anna Nagar.