Ouvrage Mottenberg is a lesser work of the Maginot Line. Part of the Fortified Sector of Boulay, the ouvrage consists of one entrance block and two infantry blocks, and is located between petits ouvrages Coume Annexe Sud and Kerfent, facing Germany.
Design and construction
The site was surveyed by CORF, the Maginot Line's design and construction agency; Mottenberg was approved for construction in September 1931. It was completed at a cost of 13 million francs by the contractor Societé Alsacienne des Travaux Publics. The petit ouvrage was to receive a separate entrance block, an 81mm mortar turret and a 135mm gun turret in a second phase, never carried outDescription
Mottenberg comprises three infantry blocks. The blocks are linked by deep underground galleries, which also provide space for barracks, utilities and ammunition storage. The galleries are excavated at an average depth of up to.- Block 1: infantry/entry block with two automatic rifle cloches (GFM), one observation cloche (VDP), one twin machine gun embrasure and one machine gun/anti-tank gun embrasure.
- Block 2: Infantry block with one GFM cloche and one JM cloche.
- Block 3: Infantry block with one GFM cloche and one retractable twin machine gun turret.