Oregon, California and Eastern Railway
The Oregon, California and Eastern Railway was a rail line between Klamath Falls and Bly in the U.S. state of Oregon. After 70 years of bringing logs from nearby forests to local sawmills, the former railroad right of way was converted to the OC&E Woods Line State Trail.
Early history
In 1919, Robert E. Strahorn, a free-lance railroad builder and promoter, formed the OC&E by first acquiring an existing line, the Klamath Falls Municipal Railway, which ran between that city and Dairy. He planned to connect the OC&E to the Southern Pacific Railroad at Klamath Falls, the Oregon Trunk Line at Bend, the Union Pacific at Crane, and the Nevada–California–Oregon Railway at Lakeview. After establishing these connections, he hoped to sell the OC&E to one of the major railways.Using operating revenues provided by twelve different logging companies along the route, by 1923 the line had been extended from Dairy to milepost 39 at Sprague River where a 1.63% westbound grade with two temporary switchbacks was built over Bly Mountain until money was available to bore a tunnel. The tunnel was never built, so operations continued through the summit switchback and a second switchback to the east. Strahorn sold the OC&E to Southern Pacific in 1925. Construction of the OC&E reached Bly in 1927. Southern Pacific sold a half-interest in the line to the Great Northern Railway in 1928. Southern Pacific and Great Northern alternated operating the OC&E for five-year periods. Trains pulled 8,000 carloads of logs annually using class O 2-8-2s and class F 2-8-0s during Great Northern management and class AC-1, AC-2 and AC-3 2-8-8-2s during Southern Pacific management. Both companies later used EMD SD9s and GP9s.