Odeon Tower
The Odeon Tower is a double-skyscraper in the Principality of Monaco. It was the first high-rise in the city-state to be built since the 1980s. At 170 metres high, Tour Odeon on its completion was the second tallest building on Europe's Mediterranean coast, after Gran Hotel Bali in Benidorm, Spain. Had Tour Odeon been built in neighbouring France, it would have been among that country's 10 highest buildings.
This project from Groupe Marzocco was considered by some to be an important renewal of economic development for the second-smallest country in the world. Its construction was launched in the middle of the economic crisis, in 2009. The building was inaugurated in April 2015.
Background
At the end of the 1980s, Prince Rainier III decided to stop building high rises in Monaco, following the construction of some controversial architectural choices. In 2008 his son, Prince [Albert II of Monaco|Prince Albert II], decided to abandon a polder project and build a new high-rise and reformed polder project instead. Both the complex's design and construction was subject to validation by the Urbanism Department of the Principality, and the Prince of Monaco himself.The construction of the main high-rise was finally voted by the Monegasque Parliament, the National Council, on February 12, 2009.
Features
- height: 170 metres, 49 floors.
- 259 residences, including 62 for-sale private luxury residences. 157 lower floor apartments, entered via a separate entrance, are for social housing.
- 10 subterranean levels with 543 parking spaces.
- restaurant and offices.
- wellness centre including spa, a fitness centre and a swimming pool.
The building received the High Quality Environmental standard label.
Milestones
- July–August 2009: Preparation works - In order to create the necessary space, a neighbouring secondary school, the Collège Charles III de Monaco, was modified. One of the playgrounds, situated behind the building and partly on the construction site, was moved onto the roof. The existing seven storey building was therefore raised by an additional floor.
- 4 November 2009 - A priest blesses the building site, thus marking the official start of the construction works. This was a symbolic step in a Principality, strongly steeped in the Catholic faith.
- October 2011 - Start of the structural works, completion of the support works.
- January 2012 - Completion of the ground floor.
- December 2012 - Completion of the 25th floor.
- July 2013 - Completion of the structural works.
- March 2014 - Completion of the coating of the building facades.
- October 2014 - Completion of the finishing touches.
- April 2015 - Delivery.
Criticism