Ninian pipeline


The Ninian Pipeline is a long crude oil pipeline, which runs from the Ninian Central platform in the northern North Sea to the Sullom Voe Terminal in Shetland Islands of Scotland.

Specification

The Ninian pipeline was laid in July 1976. It is a X65 steel pipeline with an outside diameter of with a wall thickness of 0.75 and 0.875 inches.
The pipeline has a corrosion coating and a 65 mm concrete buoyancy coating. There are 200 kg Sacrificial zinc anodes at ever 12th joint, with a total mass of 150 tonnes. Buckle arrestors comprising steel sleeves 1-inch thick and 2 m long are located every 36th joint.
The pipeline has a maximum design capacity of 910,000 bbl/day and a maximum operating pressure of 1800 psia.

Oil production

Ninian Central acted as an oil reception and export hub for a number of installations in the northern North Sea. Ninian Central receives, or received, oil from the following installations:
From the Ninian Central oil processing facilities crude oil flows to the crude oil booster pumps, a metering skid and Main Oil Line pumps. After the MOL pumps the fluids were co-mingled with oil from the Strathspey, Ninian Northern, Heather and Magnus platforms.
Oil from the field is exported through the 36" pipeline to Sullom Voe.
The first oil was received at the Sullom Voe Terminal in December 1978.

Owner and operator

The pipeline was initially operated by BP on behalf of the partner companies.
As of June 2021 the pipeline was operated by EnQuest on behalf of the owners:
  • EnQuest Heather Limited 18.0511%
  • CNR International Ltd 63.3271%
  • Chevron North Sea Ltd 2.2601%
  • Total E&P UK Limited 16.3616%