Nimbus Fish Hatchery


The Nimbus Fish Hatchery is located in eastern Sacramento County, built on the downstream side of the Nimbus Dam. It is one of the 21 fish hatcheries the California Department of Fish and Wildlife oversees. Chinook salmon and steelhead are raised, and about 4 million Chinook salmon and 430,000 steelheads released each year.

History

Salmon once spawned in the far reaches of California's rivers but with the era of dam building came the loss of spawning ground. Upstream rivers have been damned to control flooding. This has greatly diminished the availability of appropriate habitat for the fish to spawn and live in. Historically, Chinook salmon would migrate annually up the American river to the forks and streams in the Sierra Nevada mountains, but Nimbus and Folsom Dams now limit them to the Lower American River. In 1955, the Nimbus Hatchery, weir, and fish ladder became operational to mitigate the impacts the newly constructed Folsom and Nimbus Dams have on Chinook Salmon and Steelhead Trout populations in the American River. Those salmon and steelhead that cannot find a place to spawn in the approximately seven miles of remaining habitat below the dams will climb the fish ladder to Nimbus Hatchery, where they will be artificially spawned and their eggs reared for release back into the river. Specific production numbers to compensate for habitat loss were decided during the Fish and Wildlife Coordination Act Report led by the United States Bureau of Reclamation and the California Department of Fish and Wildlife on August 14, 1946.

Spawning habitat

Salmon return from the ocean to the rivers of their birth in search of specific spawning habitat. They seek out gravel 2-4 inches in diameter with which to construct a series of nests called beds. During development small salmon need side pools on the river in which to rest in the cool shade and to hide from predators. Thick vegetation along the waters edge provides shade to keep the water cool enough to survive in warmer months. Salmon require 7ppm of oxygen and a pH between 6.5 and 8. Many spawning habitats have been destroyed or are threatened by development, water pollution, water diversions, and erosion and siltation. Because of this the fish hatchery programs have been put in place to sustain fish populations.

Impacts on salmon and steelhead

  • Number of fish released annually: Salmon Steelhead
  • Number of fish spawned : Salmon Steelhead
  • Number of eggs taken: Salmon Steelhead
  • Average number of eggs per female: Salmon Steelhead
  • Average weight at spawning: Salmon Steelhead
  • Record weight: Salmon-138 lbs 107 lbs 62.5 lbs Steelhead-42 lbs 23 lbs 20 lbs
  • Incubation time: Salmon Steelhead
  • Spawning season: Salmon Steelhead
The following table displays estimated numbers and geographic distributions of Chinook salmon runs to the lower American River :
YearEstimated total runEstimated run above Nimbus DamPercent of run above Nimbus DamEstimated run below Nimbus DamPercent
194430,55223,76277.76,83022.3
194538,65624,81564.213,84135.8
194638,38830,68479.77,70420.3
1947*
194815,00012,06080.42,94019.6
194912,0008,02866.93,97231.1
1950*
195122,00013,68462.28,32637.2
195225,00019,05076.25,95023.8
Average25,94818,68972.67,07927.5

Nimbus Hatchery Operation

The hatchery is operated by the California Department of Fish and Wildlife and owned and funded by the Bureau of Reclamation as mitigation for Folsom and Nimbus Dams. To meet Reclamation's requirements, 4 million juvenile Chinook salmon and 430,000 steelhead trout are raised in the hatchery and then released to complete their journey down the river. Reclamation, the USFWS, and CDFW decided for the Hatchery to be able to hold 30 million Chinook salmon eggs with the ability to expand to 50 million if necessary.
The hatchery is part of a greater interconnected network within the region. The dams upstream from the hatchery generate power, supply water, and are a main source of flood control. As shown in figure 3, the weirs guide salmon in the direction of the ladder to enter the hatchery, preventing them from travelling upstream. From November through March river water flows down the fish ladder to encourage fish to enter and climb the steps to the hatchery. The gate at the foot of the ladder is closed when the holding pool at the top is full in order to prevent overcrowding. Ripe fish are brought from this holding pool into the hatchery spawning deck, where workers collect eggs from the females and milt from the males. Fertilized eggs are placed in hatching jars, with river water upwelling from the bottom to simulate natural conditions. When the eggs are ready to hatch the jars are tipped into large tubs where the baby fish will remain while they absorb their yolk sacs and become free-swimming. They are then moved outside to raceway pools where they are fed multiple times a day and grow rapidly. Once the fish are ready to begin their outmigration to the ocean, at 60 fish to the pound for salmon and 4 fish to the pound for steelhead trout, they are loaded into tanker trucks and transported to the river for release. From here they make their way downstream and eventually journey out to sea.

Release Points

The hatchery releases Chinook salmon from three locations. The first location is the Lower American River at the Sunrise Avenue river access, where 1.33 million are released annually. The second location is found in the Lower American River under the Jibboom Street Bridge, where another 1.33 million salmon are released. These two locations use a direct release method from trucks in which the fish are transported through long tubes. The remaining 1.33 million salmon are released to the San Pablo Bay via acclimation net pens. Trucks load the salmon into the net pens during a slack tide at Mare Island near the entrance of the Napa River. As the ebb tide begins, boats transport the pens into the Carquinez Strait, in which the fish sit for approximately two hours. The tide takes the net pen to the mouth of the San Pablo Bay where the fish are released. The Hatchery never performs salmon releases for more than two consecutive days at a single location to minimize predation from birds, seals, and other fish. Salt is added to the hauling trucks as an osmoregulatory enhancer and antistressor, at 0.5 to 1.0 mg/L, in addition to food particles.

Weir Repairs and Complications

Heavy water flows during the winter have eroded the foundation of the weir and piers, prompting major repairs in 1963, 1982, 1986, and 1999. Erosion holes in the weir were a major problem because they allowed adult Chinook salmon to pass through the weir, defeating its purpose and preventing the salmon from reaching the Hatchery's fish ladder. Flow reductions during the repair period lasted around five to nine days. These disruptions negatively affected steelhead in the area by temporarily reducing available habitat space, leading to less cover from predators and increased population density of steelhead, instigating increased predation and disease susceptibility. Additionally, lowering flows raises water temperatures while decreasing dissolved oxygen levels, further worsening aquatic living conditions. The racks and pickets of the weir can handle flows up to 5,000 cubic feet per second, and must sometimes be removed before sufficient numbers of adult Chinook salmon have arrived at the fish ladder.

1999 Weir Improvement Workshop

The most recent significant flood to damage the weir foundation and river embankment next to the Hatchery occurred in January 1997, prompting major repairs until 1999. In response, the Bureau of Reclamation asked the NMFS about the consequences of weir repairs and the safety of federally protected aquatic life. The NMFS requested that “... Reclamation and CDFG develop a long-term solution and a schedule for implementation to minimize flow fluctuations associated with the installation and removal of the Nimbus Fish Hatchery fish diversion weir racks and pickets by June 2000”. In 1999, Reclamation hosted a workshop to plan for a weir improvement project. Members of the workshop came up with the following potential solutions:
  1. Rebuild the weir foundation and use the existing fish screen barrier
  2. Add a solid foundation and a downward sloping bar rack pointing downstream
  3. Collect fish near the power plant water channel of Nimbus Dam and transport them via trucks to the Hatchery; and
  4. Collect the fish at the power plant water channel of Nimbus Dam, and use a sluice to bring them to the Hatchery
Reclamation asked the California Department of Water Resources Fish Passage Improvement Program for potential improvements for redirecting salmon to the hatchery. The DWR suggested for the fish ladder to be extended to the stilling basin downstream of Nimbus Dam, with the dam becoming the barrier for the salmon. This suggestion held similarity to two other plans, except the other two used trucks or water channels to transport the fish instead of a fish ladder. After reviewing both options, Reclamation prepared a fish ladder design extending from the hatchery to the south side of Nimbus Dam's stilling basin.

Continued Weir Planning

Reclamation began weir planning studies in 1996 and continued after the conclusion of the 1999 workshop. In December 2003, two public meetings were held in Rancho Cordova to assess the community's questions and concerns as well as further alternative suggestions for the weir. In 2006, Reclamation launched a series of workshops as part of a Project Alternatives Solutions Study to help with alternatives. The workshops took input from the USFWS, NMFS, CDFG, and the CSPR. Reclamation made an environmental assessment draft that was never publicly drafted. The draft outlined an extended fish ladder design, a possible weir replacement, and a no action approach.