Ahmedabad–Vadodara Expressway
The Ahmedabad Vadodara Expressway or Mahatma Gandhi Expressway or National Expressway 1 is an expressway connecting the cities of Ahmedabad and Vadodara in the state of Gujarat, India. The long expressway reduces the travel time between the two cities from two and a half hours to an hour. It was declared as National Expressway 1 in 1986.
The expressway has 2 lanes each side. The expressway opened in 2004. It has two exit loops at Nadiad / Kheda and Anand. In 2009, the National Highways Authority of India announced plans to upgrade the expressway to six lanes. Two-wheeler vehicles of all kinds are forbidden on the expressway. The expressway is fenced to prevent the entry of two wheelers and cattle, along with several underpasses and overbridges to allow vehicles to cross over.
History
The expressway was built at a cost of 475 crore and inaugurated by the then Prime Minister of India, Atal Bihari Vajpayee. In 2009, the Government of Gujarat asked the Government of India to extend the expressway to Mumbai. In 2011, IRB Infra won a bid to upgrade the expressway from four lanes to six lanes with service lanes and collect toll. In 2013, it was announced that IRB Infra, which was also upgrading the stretch of the National Highway connecting Ahmedabad and Vadodara as part of the deal, would not collect toll till construction work was completed. The process of upgrading the expressway to six lanes is being done at a cost of 3300 crore.Toll rates
Toll will be charged at four points - at Ahmedabad, SP Ring Road Ahmedabad, Nadiad, Anand & Vadodara. A summary table of toll rates is as below:| Vehicle category | Ahmedabad to Vadodara | Nadiad to Vadodara | Nadiad to Ahmedabad | Ahmedabad to Anand | Anand to Vadodara |
| Two wheeler | Not allowed | Not allowed | Not allowed | Not allowed | Not allowed |
| Car/Jeep/Van | 135 | 75 | 55 | 75 | 55 |