Nanmendou station


Nanmendou station is a transfer station of Line 1 and Line 2, also the first transfer station of the Fuzhou Metro. It is located near the junction of Wushan Road, Bayiqi Road and Gutian Road, Gulou, Fuzhou, Fujian, China. The section of Line 1 started operation on January 6, 2017, while the section of Line 2 started operation on April 26, 2019.

Station details

Services

The station is served by Line 1 and Line 2 and is currently the only interchange on the Fuzhou Metro network. On Line 1, the station is located between Dongjiekou and Chating stations, with a headway of 5′45″ or 11′30″ during peak hours and 8′20″ during slack hours. On Line 2, the station is located between Xiyang and Shuibu stations with a headway of 6′30″ during peak hours and 8′20″ to 10′ during slack hours.

Station design

The station has three basement levels and currently is the only transfer station on the network, serving two metro lines. The B1 floor is the concourse floor; the north side of B2 floor is the platform level of Line 1 with an island platform, the south side of the B2 floor is the transfer hall; B3 floor is the platform level of Line 2 with an island platform.

Exits and entrances

Source:A1: South of the intersection of Daoshan Road and Bayiqi RoadA2: Connect to Underground Parking of Guanya PlazaB: West of Bayiqi RoadC: Guanya Plaza B1D2: Southwest of the intersection of Gutian Road and Bayiqi RoadD3: Southeast of the intersection of Gutian Road and Bayiqi RoadE: East of Bayiqi RoadH: Northeast of the intersection of Gutian Road and Bayiqi RoadG1: Northwest of the intersection of Gutian Road and Xinquan Road