Line 1 (Nanchang Metro)
Nanchang Metro Line 1 is the first rail transit line ever constructed in Nanchang and has opened in 2015. The Phase 1 of Line 1 runs from Shuanggang to Olympic Stadium, covered North Nanchang, Old Town and East Nanchang. It is planned in Phase 2 that Line 1 will be extended to Changbei Airport to the northwest and Maqiu to the east.
Introduction
Nanchang Metro Line 1 shapes like the letter 'L', its Phase 1 is 28.737 km in length and includes 24 stations. The average distance between stations is 1,251 m. The construction has begun in 2009 and was finished by 2015.In the initial plan of 2008, Line 1 spanned from Yao Lake in the east to Lehua in the northwest, and is 35 km in length in the long-term plan, which was confirmed in June 2013 again.
- East extension: Phase 2 extends Line 1 from Olympic [Stadium station (Nanchang)|Olympic Stadium] on the west bank of Yao Lake to Maqiu on the east bank. This extension is planned to be 4 km in length, underground, and have 2 stations.
- North extension: Phase 2 extends Line 1 to Changbei Airport via Lehua.