Nyon–St-Cergue–Morez Railway
The Nyon–St-Cergue–Morez Railway,, is a narrow gauge railway in western Switzerland which nowadays operates between Nyon, on the northern shore of Lake Geneva and the French border at La Cure, the La Cure–Morez section having closed in 1958. The railway reaches a height of above sea level at the Col de la Givrine and it is the highest in the Jura Mountains.
Image:StC205+231.jpg|thumbnail|right|270px|Railcars on shed: ACMV/BBC Type Be4/4 205 in 'new livery' alongside SWS/SAAS Type BDe4/4 231 ex-CJ No.606, photographed at Saint-Cergue.
History
The line, built to gauge, was opened in three sections, the first from Nyon, a town on the shores of Lake Geneva, to the Jura mountain resort village of Saint-Cergue on 12 July 1916, then to the French border at La Cure, opened on 18 August 1917. The third section, built by the French Company Chemins de fer électriques du Jura, taking the line over the border was opened to the French town of Morez on 7 March 1921 giving a total length of. In effect, this small line linked the Swiss railways' main line from Geneva to Lausanne with that of the Chemins de fer de Paris à Lyon et à la Méditerranée . With the exception of the period from 1940 to 1948 this enabled direct services to operate on a daily basis, although wintertime conditions often made this a difficult feat. Because of its steep gradients the line was electrified from the outset at the unusual, if not unique, 2,200 Volts DC. The French section from La Cure to Morez closed on 28 September 1958.The line
Originally the line commenced outside the main station in Nyon and after passing below the Swiss Federal Railways main line it climbed steadily, steeply in places taking large curves to ease the gradient, to the mountain resort of St. Cergue. From here it runs alongside the road through the Col de la Givrine, with a summit of . Above sea level, to the village of La Cure, nowadays its upper terminus. It was here the line crossed the French border and again running alongside the road, passing the village of Les Rousses it duly arrived in the streets of Morez. The line then descended steeply to terminate in front of the PLM station.Locomotives and Rolling Stock
- all motor coaches are double cab
- all driving trailers are single cab
- B 341-342 are MU-wired for push-pull operation with Be4/4 201-205, BDe4/4 211 and Bt 301-305
Abbreviations
- ACMV : Ateliers de constructions mécaniques de Vevey
- BBC : Brown, Boveri & Cie
- BD : Bremgarten-Dietikon Bahn
- BTI : Biel-Taufelen-Ins Bahn
- CJ : Chemins de fer du Jura
- LEB : Chemin de fer Lausanne-Echallens-Bercher
- RhB : Rhätische Bahn
- SAAS : S.A. Ateliers Sécheron, Geneva
- SWS : Schweizerische Wagons & Aufzügefabrik
- YSteC : Chemin de fer Yverdon – Ste. Croix
Modernisation
The overline line voltage was changed from 2,200 Volts DC to the more common 1,500 Volts DC and automatic block signalling was installed. Work to modernise the infrastructure and implement the voltage change took place throughout 1984 and 1985. The St. Cergue–La Cure section was changed to the new, reduced voltage in mid-October 1985 and the Nyon–St. Cergue section followed on 5 December 1985. As part of this modernisation, new rolling stock was purchased, and arrived starting in autumn 1985. These were new automotrice and matching voitures pilote. During the transitional phase in the line voltage, the old cars were able to continue in service after the reduction in voltage, but at reduced speed. The old stock ran for the last time on 20 December 1985, and from 21 December all service was operated by the new trains.
Plans were put forward in 1999 to extend the line some over the French border to the village of Les Rousses but this did not prove cost effective to the communities involved and was rejected. In 2004, the Nyon terminus was moved to a two platform underground station on the north side of the main line approached by escalators from the station underpass.