MyHSR Corp


MyHSR Corporation Sdn Bhd is a Malaysian company fully owned by the Ministry of Finance of Malaysia. It was set up to be the developer and asset owner of the terminated Kuala Lumpur–Singapore [High Speed Rail] project at Malaysian side, under the government's move to improve connectivity between the two countries, as currently traffic congestion is acute and far exceeds the capacity of the Causeway at Johor Bahru, with the current infrastructure provisions.
The primary objective for the construction of the HSR is to reduce the travel time between Kuala Lumpur and Singapore to 90 minutes by strengthening the link between two of Southeast Asia's most vibrant and fast-growing economic engines. In addition, the HSR presented an opportunity to open up and rejuvenate smaller cities in Peninsular Malaysia by connecting them to the two major metropolises.

HSR projects